Similar Projects
Last Updated | 01/10/2022 06:30 AM |
Project Title | 2022 Pavement Management Program |
Physical Address | View project details and contacts |
City, State (County) | Hutchinson, MN 55350 (McLeod County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,237,854 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 2022 Pavement Management Program: Keith Street SW (South Grade Road to Neal Avenue), Neal Avenue SW (Keith Street to Sunset Street), Sunset Street SW (South Grade Road to Linden Avenue), Laura Avenue SW (Approx. 150 LF West of Sunset Street to Sunset Street) and Linden Avenue SW (Dale Street to Harrington Street); roadway reconstruction by construction of grading, water main/services, sanitary sewer, storm sewer, curb and gutter, draintile installation, bituminous surfacing, sidewalk, street lighting, landscaping, restoration and appurtenances The approximate major quantities of work involved are: Item Unit Quantity Full Depth Reclamation SQ YD 15400 Excavation CU YD 10900 Select Granular Borrow CU YD 3550 Gate Valve EACH 21 Concrete Curb and Gutter LIN FT 7000 Concrete Driveway Pavement SQ YD 980 4” Concrete Walk SQ FT 2900 Bituminous Paving SQ YD 15000 RC Pipe Sewer Design 3006 Class V LIN FT 2700 Lighting System LUMP SUM 1 Trees TREES 56 |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |