Similar Projects
Drilling, Construction and Testing Quarry Hills Well
Alteration
Bidding
Genola, UT

Industrial Lift Station Rehab and Piping Upgrades
Post-Bid
Salt Lake City, UT

Zone 2 and 3 Pump Station and Pipeline Project
Post-Bid
Herriman, UT 84096

Kanarraville Well
Results
Less than $350,000 est. value
Cedar City, UT 84721

Old Meadows Ranchos Project
Results
Less than $200,000 est. value
Cedar City, UT 84721

City Creek Pump Station and Pipeline
Construction
Saint George, UT

Walker Lane Well Rehabilitation
Post-Bid
$385,462 est. value
Holladay, UT 84117

Wellhead Equipment for Forge
Term Contract
Results
Salt Lake City, UT

Booster Pump Station #2 Rehabilitation
Post-Bid
Ogden, UT 84310

Water Treatment Facility - Green Well
Results
Riverton, UT 84065

Booster Pump Station #3 Rehabilitation
Post-Bid
Ogden, UT 84310

University of Utah Category 4 Inspection Drill Pipe, Hwdp, Collars, Stabilizers
Term Contract
Results
Salt Lake City, UT

Public Works SCADA System Upgrade 2021
Post-Bid
$385,000 est. value
Lindon, UT

Production Well Drilling
Results
Millville, UT

20E Pioneer WWPS Replacement Project
Renovation
Post-Bid
$1 to $3,400,000 est. value
West Valley City, UT

Reported 03/11/2022 12:00 AM
Project Title

Stansbury Park Well 5 Equipping Project

Physical Address View project details and contacts
City, State (County) Erda, Stansbury Park, UT 84074   (Tooele County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally includes the following: 1) Equipping of the existing well, construction of a concrete masonry unit (CMU) pump house. 2) Installation of Steel and Ductile Iron pump-to-waste pipe, PVC drain pipe, and Steel and Ductile Iron main discharge pipe. 3) Furnishing and installing new backup generator, automatic transfer switch, electrical power and control equipment, HVAC units, RTU cabinet and related facilities and instruments, conduits, conductors, etc. 4) Installation and commissioning of an owner purchased automatic screen filter. 5) Install new tablet chlorination system with all required appurtenances. 6) Construct civil site and piping improvements as shown on the drawings and repair and replace surfaces and other disturbed improvements as required for a complete and operable well.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents