Similar Projects
Cleaning Out and Plugging One Abandoned Well, Ross Township, Allegheny County
Bidding
$200,000 to $299,999 est. value
PA

Station Road Pumping Station Improvements
Bidding
$1,800,000 est. value
Erie, PA 16507

Powerflow Fire Pump
Post-Bid
Pittsburgh, PA 15219

WWTP Grey Water Pumps
Post-Bid
Less than $72,000 est. value
Pittsburgh, PA 15222

Water Supply System Upgrades, Tobyhanna Army Depot
Results
$5,000,000 to $10,000,000 est. value
Tobyhanna, PA

Construction - Circulation Pump Replacement
Results
Coraopolis, PA

Replacement Of Dry Well Pumps, Piping, Valves, By-Pass Pumping Etc., In Existing Sanitary Sewer Pump Stations Located Near Brady Street And Fourth Street
Bidding
West Wyoming, PA 18644

Inde-Old City Hall Watertable Conservation
Post-Bid
$100,000 to $250,000 est. value
Philadelphia, PA 19106

Maintenance and Repair of Sewage Pump Stations
Term Contract
Results
Penn Hills, PA

Well #3 Ground Storage Tank Rehabilitation
Bidding
Coopersburg, PA

Rebuilding of Submersible Pumps
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

ORF Return Pumps Mag Meter Project (2019)
Results
$100,000 to $150,000 est. value
Erie, PA 16507

Pump Ametek 150178-11 Circulating
Bidding
Philadelphia, PA

Swale Brook Well House Improvements
Post-Bid
Tunkhannock, PA 18657

Cleaning Out and Plugging Five (5) Abandoned Wells
Results
Harrisburg, PA

Last Updated 04/30/2020 03:02 PM
Project Title

Well 40 Rehabilitation Work and Pump Test

Physical Address View project details and contacts
City, State (County) Horsham, PA 19044   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,000 to $40,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1.Mobilization/demobilization 2.Removal and visual inspection of existing well pump and accessories 3.Pre-rehabilitation borehole televising to assess well conditions 4.Mechanical and chemical rehabilitation of the well 5.Disinfection of the well 6.Idle time (seven to fifteen business days) to allow for third-party contractor to perform well evaluation and testing 7.Re-installation of existing well pump and accessories 8.24-hour pumping test using existing well pump

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents