Similar Projects
Rehabilitate Runway 7/25 (East End)
Infrastructure
Results
$116,000 est. value
Iowa City, IA

Runway 7/25 Threshold Relocation
Infrastructure
Results
$450,000 est. value
Iowa City, IA

Last Updated 06/21/2021 07:52 AM
Project Title

Runway 13-31 Rehabilitation and Lighting Upgrade

Physical Address View project details and contacts
City, State (County) Sioux City, IA 51111   (Woodbury County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,505,185
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at the Sioux Gateway Airport, 2403 Aviation Boulevard, and includes the reconstruction of Runway 13-31 shoulders with new asphalt (approximately 9,002 feet in length, 20 feet wide on each side), rehabilitation of the Runway 13 and 31 blast pads (approximately 200 feet by 200 feet each), and replacement of Runway 13-31 high intensity runway lights. Alternate #1 is for distance remaining signs, and Alternate #2 is to widen the shoulders from 20 feet to 25 feet on each side.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents