Similar Projects
Decker Lake Youth Center HVAC Controls Upgrade
Renovation
Sub-Bidding
$112,000 CJ est. value
West Valley City, UT 84119

Ogden School for the Deaf and Blind Main Campus Cooling Tower Replacement
Renovation
Sub-Bidding
$190,000 CJ est. value
North Ogden, UT 84404

Southwest Technical College Student Services Remodel
Renovation, Term Contract
Post-Bid
Cedar City, UT 84720

SD 100/160 HVAC Overhaul Kits
Alteration
Post-Bid
Salt Lake City, UT

USU Eastern Chiller Relacement Project
Results
Logan, UT

HVAC Installation
Results
$100,000 to $250,000 est. value
Tooele, UT

DFCM Construction Pre-Qualified Mechanical - Cannon Health Building 4th Floor CRAC Unit Replacement Department Of Health & Human Services
Renovation
Sub-Bidding
$100,000 CJ est. value
Salt Lake City, UT 84116

Canterbury Furnaces
Alteration
Post-Bid
Salt Lake City, UT

HVAC Upgrade, Ft Duchesne, UT
Results
Fort Duchesne, UT 84026

Salt Lake City ATCT CRAC Unit Upgrades
Term Contract
Post-Bid
Salt Lake City, UT

Health Science Campus High Temp Water Line Removal
Results
$1,140,000 est. value
Salt Lake City, UT 84112

HVAC and Plumbing
Term Contract
Post-Bid

Removal and Replacement of HVAC System
Results
Tooele, UT 84074

Air Filters
Alteration
Post-Bid
Ephraim, UT 84627

J041--660 - (S4) ** EMERGENT** Air Handler Repair Bldg 2 AHU Repairs
Term Contract
Results
Salt Lake City, UT 84148

Last Updated 11/23/2022 02:04 PM
Project Title

TSAC Cooling Upgrade - 2022

Physical Address View project details and contacts
City, State (County) Moab, UT 84532   (Grand County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Grand County School District is bidding three projects simultaneously with the same due dates for the bid and questions. Each project has its own construction dates and requirements. Each project bid must be submitted separately. The District will determine the lowest and most qualified bidder by combining the three separate bids together with the intent of awarding all three projects to the same contractor. The projects are the GCHS Boiler upgrade, the TSAC cooling upgrade and the HMK cooling upgrade. All questions, interpretations, or clarifications regarding this solicitation shall be submitted through the Utah Public Procurement Place and are subject to the deadline for submitting questions before November 9, 2022 at 4:00 PM There is no requirement to attend a pre-bid conference. The project consists of: 1. Installation of new air conditioning split systems related, piping, accessories and electrical components as indicated on drawings and within the specifications. 2. Framing, sheet rock and painting for new chases related to the new refrigerant piping & condensate drains. 3. Roofing as required for the new AC outdoor units and refrigerant piping 4. Piping of refrigerant and condensate piping thru the existing building as indicated 5. It is the intent that this construction shall be completed as soon as possible or before May 23, 2023.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents