Similar Projects
Pouring and Finishing of Concrete for Outdoor Classroom Projects
Infrastructure
Design
$238,000 CJ est. value
Huntington, WV 25701

Six (6) Bag Concrete Class B and Six (6) Bag Concrete Class B W/ Water Reducer for the 2022 Construction Year
Alteration
Post-Bid
Parkersburg, WV

Booker T. Washington Monument Concrete Work
Alteration
Post-Bid
$200,000 est. value
Charleston, WV

Building 97 Williamson Slab Settlement Repairs
Alteration
Results
Williamson, WV 25661

Rock CK I- C
Alteration
Results
WV

Street Concrete Replacement
Alteration
Post-Bid
$100,000 est. value
Vienna, WV

Courthouse Bell Tower Stairs
Infrastructure
Results
New Martinsville, WV

Concrete Work
Infrastructure
Post-Bid
$130,000 CJ est. value
Nitro, WV 25143

Repair Storm Drain Lot 7 Laidley Lot
Infrastructure, Alteration
Results
$12,450 est. value
Charles Town, WV

Precast Concrete Lagging
Term Contract
Post-Bid
Charleston, WV 25301

Eight (8) 21" Prestressed Concrete Box Beams 10-21-B178
Alteration
Results
Charleston, WV

Building 25 Concrete Repair
Renovation
Post-Bid
$235,000 CJ est. value
Parkersburg, WV 26101

Forming and Placement only of Concrete Sidewalks with Expansion Joints
Alteration
Results
Barboursville, WV 25504

PO - Waites Run Bridge Prestressed Concrete Beams
Alteration
Results
Charleston, WV

Reinforced Concrete Walls for Berkeley Salt Shed
Alteration
Results
Martinsburg, WV 25401

Last Updated 02/02/2023 11:27 AM
Project Title

Building 34 Concrete Repair

Physical Address View project details and contacts
City, State (County) Weirton, WV 26062   (Hancock County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $235,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Building 34 Concrete Repair BID BOND: All Vendors submitting a bid on a construction project shall furnish a valid bid bond in the amount of five percent (5%) of the total amount of the bid protecting the State of West Virginia. THE BID BOND MUST BE SUBMITTED WITH THE BID OR VENDOR'S BID WILL BE DISQUALIFIED. PERFORMANCE BOND: The apparent successful Vendor shall provide a performance bond in the amount of 100% of the contract. The performance bond must be received by the Agency prior to Contract award. LABOR/MATERIAL PAYMENT BOND: The apparent successful Vendor shall provide a labor/material payment bond in the amount of 100% of the Contract value. The labor/material payment bond must be delivered to the Agency prior to Contract award. MAINTENANCE BOND: The apparent successful Vendor shall provide a two (2) year maintenance bond covering the roofing system if the work impacts an existing roof. The amount of the bond must be equal to the price associated with the percentage of the project impacting the roof. The maintenance bond must be issued and delivered to the Purchasing Division prior to Contract award SUBSTANTIAL AND FINAL COMPLETION: Vendor shall achieve substantial completion by Thirty (30) calendar days and final completion by Sixty (60) calendar days after the Contract start date established by the issuance of the Notice to Proceed. Failure to meet the deadlines established herein, unless extended by change order authorizing additional time free of liquidated damages, will result in liquidated damages being applied.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents