Similar Projects
Last Updated | 06/23/2023 02:02 PM |
Project Title | Terrace Restaurant Dock Lift Replacement 2023 |
Physical Address | View project details and contacts |
City, State (County) | New Paltz, NY 12561 (Ulster County) |
Category(s) | Single Trades |
Sub-Category(s) | Conveying Systems |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Selection Underway, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work for this project consists of removing and replacing the existing dock lift with new at the Terrace Restaurant on campus. The main features of the work shall include, but are not limited to the following: Removing existing deteriorated dock lift complete and legally disposing off campus. Providing and installing new dock lift of similar type in exact location of removals area at rear of building. Disconnection of existing electrical low voltage wiring or power to existing dock lift, then reconnection of existing low voltage wiring and power to new dock lift to ensure a completely functional dock lift system before turnover to college. Coordination with existing field conditions to ensure new dock lift will be installed without conflict. Contractor is responsible for removing all left-over installation packaging and construction debris from the project site. Use of campus dumpsters will not be permitted. Contractor shall provide and maintain full access and egress in and out of building entry locations. Contractor, Contractors employees, and all sub-contractors to Contractor shall park employee vehicle(s) in the College approved location during all times of work, and each contractor and sub-contractor employee shall purchase a contractor parking hang tag for the duration of the work period, no exceptions. Providing all labor, supervision, project coordination, tools, and equipment required for the Work. Contractor shall be fully responsible for reviewing all existing conditions, all dimensions, all material quantities necessary, and all new work indicated or shown; and as fully coordinated with college drawing and new dock lift selected prior to bidding. Contractor shall provide daily project clean-up of debris created by the Work, restoration of existing adjacent areas disturbed by this contract work, and final cleaning of all areas of the completed Work. All work shall be completed in accord with applicable manufacturer’s materials standards; applicable NYSDOT Standards, NY State Building Code requirements, and applicable Federal & State regulation. Contractor shall leave work area in a ready to use condition without the College having to clean any areas of work where Contractor performed work. The project shall commence upon award of contract or Notice To Proceed. Completion of all construction Work shall be no later than August 18, 2023, though additional days are added beyond the construction work period to allow for administrative paperwork, such applications for payment and closeout material. All work on this Contract is to be completed within/by 79 days after the date of the Notice to Proceed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |