Similar Projects
Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Design
$10,000,000 CJ est. value
Spokane Valley, WA 99206

Latah Creek Golf Course Parking Lot Improvements
Infrastructure
Bidding
$476,321 est. value
Spokane, WA 99223

Asphalt and Concrete Services
Term Contract
Bidding
Colville, Spokane, Spokane Valley, WA 99202

Evergreen Road Preservation
Infrastructure
Post-Bid
Spokane Valley, WA

American Rescue Plan Expenditure Category Addressing Drinking Water Transmission
Infrastructure
Post-Bid
$4,000,000 est. value
Spokane, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Stormwater Swr421 Belle Terre Road
Infrastructure
Results
$683,911 est. value
WA

44th Avenue -Crestline Street to Altamont Street
New Construction, Infrastructure
Bidding
$200,000 est. value
Spokane, WA

Wastewater Access Frames and Covers
Alteration
Post-Bid
Spokane, WA

Pedestrian Ramp Replacement
Infrastructure
Results
Deer Park, WA

Miscellaneous Pipe and Fittings
Infrastructure
Post-Bid
Spokane, WA

Service Change Bus Stops Phase 1
Infrastructure
Results
Airway Heights, Liberty Lake, Spokane, Spokane Valley, WA

Sprague/barker Intersection Improvement Project
Infrastructure
Post-Bid
$600,000 est. value
Spokane Valley, WA 99016

Kinney Way Sidewalk Improvements
Term Contract
Results

Wilbur Sidewalk Boone to Mission
Infrastructure
Post-Bid
$650,000 est. value
Spokane Valley, WA

Reported 06/14/2022 12:00 AM
Project Title

Stormwater for Washington Basin - Knox Avenue

Physical Address View project details and contacts
City, State (County) Spokane, WA   (Spokane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,800,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of 3 Modular Wetland stormwater treatment systems and approximately 360 linear feet of 21 in sanitary sewer, 440 linear feet of 6" ductile iron water main 70 linear feet of 12" ductile iron water main, 3 type 2 - deep drywells, 790 linear feet of sidewalk, 1940 square yards of HMA pavement, sundry utility adjustments, and other related miscellaneous items.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents