Similar Projects
Tap Society Restaurant
New Construction, Infrastructure - 3,500 SF
Conception
$500,000 to $1,000,000 CJ est. value
Rosemount, MN 55068

River's Edge Development
New Construction, Infrastructure
Design
Farmington, MN

River's Edge Development
New Construction, Infrastructure
Design
Farmington, MN

Dodd Boulevard From Highview Avenue to Glasgow Way
Infrastructure
Bidding
$11,669,791 CJ est. value
Rosemount, MN 55068

Dodd Boulevard From Highview Avenue to Glasgow Way
Infrastructure
Bidding
$11,669,791 CJ est. value
Rosemount, MN 55068

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

2021 Crack Sealing and Seal Coating
Results
MN

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

Highlands at Settlers Ridge Residential Development
New Construction, Infrastructure
Design
Inver Grove Heights, MN

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

Last Updated 11/21/2022 03:35 PM
Project Title

215th Street Extension, Galway Lane and 220th Street Improvements

Physical Address View project details and contacts
City, State (County) Lakeville, MN 55044   (Dakota County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $4,950,749 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 21, 2022, construction is underway. A timeline for completion has not been confirmed. construction of the 215th Street Extension, Galway Lane and 220th Street Improvements. The project involves roadway construction, storm sewer and watermain installation and grading. The majority of the work includes bituminous paving, utility installaton, traffic signal modifications, concrete curb and gutter installation and stormwater basin grading. The provisions of MN Statute 16C.285 Responsible Contractor are imposed as a requirement of this contract. The City Council reserves the right to reject any and all bids. No bid may be withdrawn for a period of 60 days. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents