Similar Projects
Eau Claire, N. Clairemont Avenue, Sth 312 To County Line Road
Bidding
Eau Claire, WI 54701

2021 Road Maintenance
Bidding
$280,000 to $340,000 est. value
Middleton, WI

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Greenwood - Spencer, Elm Drive to East County Line
Bidding
Greenwood, Spencer, WI

Culverts
Term Contract
Post-Bid
WI

CTH 'G' Street Construction
Results
Egg Harbor, WI 54209

2021 Street and Utility Improvements - North Main Street / CTH MM
Bidding
Oregon, WI 53575

Village of Dane Southeast Public Works Loop
Post-Bid
Dane, WI

ATV / UTV Trail Construction
New Construction
Results
Lake Wissota, WI 54729

2021 Woodland Drive Extension
Bidding
$300,000 est. value
Beaver Dam, WI 53916

HMA Paving
Post-Bid
Howard, WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Last Updated 01/13/2021 11:40 PM
Project Title

SCL - Kewaunee, SCL - South City Limits Kewaunee

Physical Address View project details and contacts
City, State (County) WI   (Kewaunee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STH 42; 9.903 Miles; Grading, Base, Milling, Asphalt Pavement, Culvert Pipe, Storm Sewer, Box Culvert Replacement, Beam Guard, and Pavement Markings. Excavation Common, 3,611 CY; Backfill Structure, 4,671 Ton; Base Aggregate Dense, 11,586 Ton; Select Crushed Material, 210 Ton; Breaker Run, 214 Ton; Concrete Masonry Culverts, 415 CY; Bar Steel Reinforcement, 54,050 Lbs; Bar Steel Reinforcement Coated, 6,950 Lbs; Marking Epoxy, 154,490 LF; Construction Staking, 73,276 LF; Construction Staking, 5 Each; Construction Staking, 2 LS; Culvert Pipe Corrugated Steel, 57 LF 18“, 74 LF 24“; Culvert Pipe Reinforced Concrete, 152 LF 30“; Storm Sewer Pipe Reinforced Concrete, 126 LF 18”; Beam Guard, 6,764 LF; Beam Guard Energy Absorbing Terminals, 28 Each; Asphaltic Surface, 270 Ton; HMA Pavement, 50,460 Ton; Removing Asphaltic Surface Milling, 194,740 SY; Tack Coat, 25,850 Gals; Pipe Arch Corrugated Steel 57“ X 38”, 4 LF; Foundation Backfill, 320 CY.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents