Similar Projects
Broadway at the Beach Pump Station Rehabilitation
Bidding
$400,000 est. value
Myrtle Beach, SC 29578

Crabtree Force Main/Park Hill Pump Station
Renovation, Infrastructure
Bidding
$550,000 est. value
Conway, SC 29526

Lake Rabon Raw Water Pump Station Surge Tank Improvements
Post-Bid
$600,000 to $700,000 est. value
Laurens, SC

Plant Control Pump Station - Pump Base Improvements
New Construction
Post-Bid
Charleston, SC

McRae Road Pump Station Upgrade
Results
Camden, SC 29020

Sanitary Sewer System Improvements at Rices Creek Lift Station
Results
Liberty, SC 29657

Clemson Pump Station Trash Rack Rake System
New Construction
Bidding
$1,000,000 to $5,000,000 est. value
Clemson, SC

Buchanan Bridge Pump Station and Force Main
Renovation
Post-Bid
Less than $400,000 est. value
Chesterfield, SC

Regional Pump Station Upgrades
Results
Less than $4,279,100 est. value
North Charleston, SC 29419

Clemson Research Park and Boscobel Pump Station Improvements
Renovation
Bidding
$400,000 est. value
Anderson, SC

O Dell Street Lift Station and Sewer Line
Infrastructure
Post-Bid
Liberty, SC 29657

Shore Road Pump Station Improvements New Lime Storage and Feed System
Renovation
Results
$150,000 est. value
Lexington, SC

Rehabilitation Of Pump Station #339
Renovation
Bidding
$1,200,000 est. value
North Charleston, SC

Sanitary Sewer Improvements Corley Tract Pump Station Modifications
Renovation
Post-Bid
$200,000 est. value
Lexington, SC

Pump Station 106
Results
Moncks Corner, SC 29461

Reported 05/11/2022 12:00 AM
Project Title

Parris Bridge Road Booster Pump Station

Physical Address View project details and contacts
City, State (County) Spartanburg, SC   (Spartanburg County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the demolition and replacement of an existing Booster Pump Station and associated yard piping, new fire hydrant, electrical SCADA and resurfacing of the existing driveway.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents