Similar Projects
US 26: Little Humbug Creek Bridge
Demolition, New Construction, Infrastructure
Design
$3,053,100 CJ est. value
Seaside, OR 97138

RFQ D/B - Country Lane Repair at the Tongue Point Job Corps Center
Infrastructure
Bidding
$5,000,000 CJ est. value
Astoria, OR 97103

RFQ D/B - Design/Build Highway 30 Retaining Wall at Tongue Point Job Corps Center
Infrastructure
Bidding
$1,000,000 CJ est. value
Astoria, OR 97103

Ecola Ridge Young Stand Thinning
Alteration
Post-Bid
Cannon Beach, OR 97110

Excavation Service
Infrastructure
Post-Bid
Astoria, OR

Big Creek Hatchery Residence Replacement Site Work
Infrastructure
Results
$40,000 to $45,000 est. value
Astoria, OR 97103

Mouth of the Columbia River Sand Island Pile Dikes Repair
Infrastructure
Results
$49,037,000 CJ est. value
Astoria, OR 97103

Fairfield Inn by Marriott / Astoria
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Astoria, OR 97103

2021 Bond - Knappa School District
New Construction, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Astoria, OR 97103

Camp Rilea Maneuver Grounds RV Style Dump/Fill station
Infrastructure
Bidding
$145,000 CJ est. value
Warrenton, OR 97146

Construct Fast Response Cutter Homeport Astoria
New Construction, Term Contract
Post-Bid
Astoria, OR

OR202: Dresden St. To 4th St. (Astoria) Sec.
Infrastructure
Results
$6,498,769 CJ est. value
Astoria, OR 97103

South Spruce Street Housing / Cannon Beach
New Construction, Infrastructure
Pending Verification
$3,800,000 CJ est. value
Cannon Beach, OR 97110

Asbestos Abatement at the Guard House at Fort Stevens State Park
Term Contract, Infrastructure
Bidding
$100,000 CJ est. value
Warrenton, OR 97121

Plympton Creek Pile Removal
Infrastructure
Post-Bid
$300,000 est. value
OR

Last Updated 01/23/2023 07:04 PM
Project Title

RFP Construction Manager - Pier 2 West Rehabilitation

Physical Address View project details and contacts
City, State (County) Astoria, OR 97103   (Clatsop County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

RFP Construction Manager - Rehabilitation of Pier 2 West. A portion of the contract to be awarded is a Public Works contract within the meaning of ORS 279C.800 thru 279C.870 and will be subject to the Davis-Bacon Act (40 U.S.C. 3141 to 3148). Deadline for Written Questions 11/7/2022

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents