Similar Projects
Municipal Solid Waste and Recycling Services
Term Contract
Bidding
NY

Gedney Way Recycling Facility Mixed Debris Removal
Infrastructure
Bidding
White Plains, NY

Hauling and Disposal of Sewage Treatment Plant Sludge
Post-Bid
Armonk, NY 10504

Water Treatment Plant Sludge Removal and Recycling Services For 2020
Post-Bid
Millwood, NY 10546

Lumber
Results
White Plains, NY 10601

Refuse, Recycle, Carting Removal Services
Results
Mamaroneck, NY 10543

Construction Demolition Debris
Term Contract
Post-Bid
Yonkers, NY 10700

Removal and Disposal of Dewatered Sewage Sludge from the New Rochelle WRRF
Term Contract
Results
New Rochelle, NY

Soil Disposal at 35 LUKOIL Stations in NY, NJ & PA
Term Contract
Post-Bid

Trash Removal Services
Post-Bid
Hartsdale, NY 10530

Soil Disposal at 35 LUKOIL Service Station
Term Contract
Post-Bid

Lumber
Post-Bid
White Plains, NY 10601

Treated Lumber
Post-Bid
Rye, NY 10580

Recycling Food Compost Waste Disposal
Post-Bid
White Plains, NY 10600

Removal of Waste, Rubbish, Garbage and Recycling
Post-Bid
Shrub Oak, NY 10588

Reported 05/18/2021 12:00 AM
Project Title

Hauling of Liquid Waste from the Water Filtration Plant

Physical Address View project details and contacts
City, State (County) Bedford Hills, NY   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all necessary labor and equipment to pump waste from an underground 30,000 tank at the Bedford Water Plant, 215 Cross River Road, Katonah and haul it to the Town for Bedford Wastewater Plant at the intersection of Beaver Dam Road and Harris Road in Bedford Hills. The waste consists of diluted and neutralized chlorine, sodium hydroxide, and citric acid used to clean the membranes at the Bedford Water Plant. It s not considered hazardous material. Contractor shall comply with all applicable laws, including having a valid Waste Transporter Permit from NYSDEC. Pumping at the Bedford Water Plant is accomplished by dropping a suction hose through a 24” manhole cover. Discharge at the wastewater plant is by gravity into a 24” manhole. There is typically no wait time to access the wastewater plant. Please note that the wastewater plant does not accept septic waste. This is a special arrangement for only waste from the Town water plant.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents