Similar Projects
Utility Improvements
Bidding
Minnetrista, MN

2021 Lift Station Improvements
Renovation
Bidding
Mound, MN

Lift Station Maintenance and Repair Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

DNR2 RFB Brainerd Office Replacement Lift Pumps
Renovation
Post-Bid
Brainerd, MN 56401

Wood Lake Lift Station Improvements
Results
$625,000 est. value
Richfield, MN

Ridgedale Booster Station Improvements
Results
$450,000 est. value
Minnetonka, MN 55345

Lakefield Infrastructure Improvement
New Construction
Bidding
Lakefield, MN

2021 Sanitary Lift Station No. 33 and No. 34 Improvements
Renovation
Post-Bid
$532,065 est. value
Moorhead, MN

Williston Road Lift Station Rehabilitation
Results
$1,950,000 est. value
Minnetonka, MN

Project A Sanitary LS 6, 7, 11, and SCADA System Improvements
New Construction
Bidding
Saint Cloud, MN

DNR4 Gilfillan Lake WMA Pump Control Replacement
Renovation
Results
$35,000 est. value
MN

Project B Sanitary LS 10, 14, 15, and Riverside Park
New Construction
Bidding
Saint Cloud, MN

Storm Lift Station Improvements
Results
$735,000 est. value
Eagan, MN

Eden Avenue and Brookside Avenue Improvements
New Construction
Bidding
Edina, MN 55435

Construction of a Booster Station
Results
Less than $350,000 est. value
Saint Louis Park, MN 55426

Last Updated 04/16/2021 06:43 AM
Project Title

2021 Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Vadnais Heights, MN   (Ramsey County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 LS Mobilization and Demobilization 1 LS Traffic Control 1 LS Temporary Wastewater Flow Control 1 LS Site Modification and Miscellaneous Site Work 1 LS Wet Well Precast Concrete Top Slab Replacement with Access Hatch and Safety Grating 1 LS New Valve Vault 1 LS Wet Well Vent with Carbon Filter 1 LS Wet Well and Valve Vault Coating 1 LS Bituminous Pavement – Final Surface Restoration 1 LS Lift Station Electrical

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents