Similar Projects
Designed Overlay, ADA Improvements: Hma Removal and Resurfacing, Class D Patching, ADA Curb Ramps Improvements
Infrastructure
Bidding
$4,000,000 est. value
Libertyville, IL 60048

Resurface Barclay Boulevard from Aptaksic Road to Half Day Road in Lincolnshire
Infrastructure
Bidding
$4,000,000 est. value
Lincolnshire, IL 60069

Washington Street Resurfacing
Renovation
Post-Bid
IL

2021 Road Program Forest Knoll Drainage Improvements
Post-Bid
Libertyville, IL

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

2020 Rebuild Illinois Bonds Program
Results
Less than $395,000 est. value
Deer Park, IL 60047

2022 Street Improvement Project
Infrastructure
Bidding
$430,000 est. value
Wauconda, IL

2021 Crestfield Subdivision Resurfacing
Post-Bid
Indian Creek, IL

Rollins/Wilson Junction Chamber Rehabilitation
Results
Waukegan, IL

Asphalt Roadway
Post-Bid
Deerfield, IL

2020 Road Program
Results
Less than $495,730 est. value
Deer Park, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

River Trail School Pavement Replacement
Results
Gurnee, IL 60031

Pulverization of Margate, Parkhill, Crescent Knoll and Portions of Minard Lane
Post-Bid
Green Oaks, IL

Deerfield Parkway Rehabilitation
Renovation
Results
IL 60089

Last Updated 06/17/2022 07:16 AM
Project Title

2022 Combined Road Program

Physical Address View project details and contacts
City, State (County) Kildeer, IL   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes, but is not limited to, the following major work items: hot-mix asphalt surface removal, preparation of base, aggregate base repair, pavement patching, hot-mix asphalt binder and surface course placement, driveway pavement removal and replacement, drainage and utility structure adjustments, thermoplastic pavement markings, landscaped shoulder restoration, and other associated improvements

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents