Similar Projects
Court Street Bridge Electrical, Mechanical and Structural Repair and Maintenance Services
Post-Bid
NJ

Drawbridge Preventive Maintenance
Results
$20,000,001 to $50,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair Contract
Results
$10,000,001 to $20,000,000 est. value

Bridge Deck and Median Barrier Reconstruction Milepost 160.6 to 162.5
Results
$57,288,442 est. value
Fair Lawn, Paramus, Rochelle Park, Saddle Brook, NJ

Replacements of West Century Road Bridge Over Sprout Brook - Bridge No. 020046B
Results
Paramus, NJ

Maintenance Orphan Bridge Repair Contract 2020-1, Various Locations, Statewide
Results
Less than $5,000,000 est. value

Maintenance Job Order Contracting (Joc) Bridge Repairs, North - 2019
Results
$5,000,001 to $10,000,000 est. value

Replacement of Plymouth Lane Bridge
Results
Saddle River, NJ 07458

Kingsland Avenue Bridge Electrical, Mechanical and Structural Repair and Maintenance Services
Results
Lyndhurst, Nutley, NJ 07071

Bridge Repairs
Results
Park Ridge, NJ

Signature Bridge Preventive Maintenance Contract 2019-1
Results
$20,000,001 to $50,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair Contract, Statewide - 2021
Results
$10,000,001 to $20,000,000 est. value

Last Updated 07/27/2021 08:46 AM
Project Title

Replacement of Greenwood Avenue Bridge

Physical Address View project details and contacts
City, State (County) NJ   (Bergen County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the Greenwood Avenue Bridge (No. 0200-35C) and improvements to several associated features including utility lines and stormwater outfalls. The proposed project involves the full replacement of the Greenwood Avenue Bridge with a minor span of the roadway, relocation of stormwater outfalls through the proposed 3-sided rigid frame walls, the implementation of various drainage improvements, the relocation of an existing gas main to a notched utility bay at the north end of the bridge, and the relocation of an existing water main through the walls of the proposed 3-sided rigid frame. The existing Greenwood Avenue Bridge will be replaced with a single span structure consisting of a precast concrete 3-sided rigid frame on cast-in-place reinforced concrete footings. The cast-in-place footing and 3-sided rigid frame construction will be facilitated by the installation of temporary cofferdams as depicted on the Contract Plans.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents