Similar Projects
L51 and L52 Pump Station (P-717 and P-718) - Odor Control (IR)
New Construction
Bidding
$1,422,000 est. value
Saint Louis, MO

Reservoir Pump Station Improvements
Infrastructure
Bidding
$90,000 to $130,000 est. value
Trenton, MO 64683

North Union Street Sanitary Sewer and Lift Station and North Industrial Park Sanitary Sewer Extension
Infrastructure
Post-Bid
Jackson, MO 63755

11th Plat Pump Station Repairs 2021
New Construction
Post-Bid
Kansas City, MO

FF Highway Pump Station Retrofit
New Construction
Results
Parkville, MO

Raw Water Pump Station, Value Vault and Zebra Mussel Control
Renovation
Results
Smithville, MO

Wastewater Treatment Facility Improvements
Renovation
Bidding
$5,000,000 est. value
Leeton, MO

Pump Station
New Construction
Post-Bid
California, MO

15th Street Pump Station Upgrade and Sewer Separation
Demolition
Results
Kansas City, MO

Platte County Regional Sewer District Pump Station Replacement - 2022
Renovation
Bidding
$300,000 est. value
Platte City, MO

Pelham and Central Regional Lift Station
New Construction
Post-Bid
Sedalia, MO

Water Plant Filter Gallery and Return Sludge Pump Station Pipe Coating
Renovation
Results
Saint Peters, MO 63376

South Stracks Church In-Line Booster Station and Water Innsbrook Main
New Construction
Bidding
$1,500,000 est. value
O'Fallon, MO

Electrical Substation Upgrade
New Construction
Post-Bid
Independence, MO 64050

Wastewater Treatment Facility Improvements
New Construction, Infrastructure
Results
Laredo, MO

Reported 05/14/2022 12:00 AM
Project Title

Chlorine Booster Station

Physical Address View project details and contacts
City, State (County) Marshall, MO   (Saline County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of existing booster station building, construction of an ammonia feed building, and installation of new chemical feed equipment for a complete operating chlorine booster system.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents