Similar Projects
Replace Roof/ Camp Williams
Alteration
Conception
$568,800 est. value
New Lisbon, WI

Replace Building 6 A-Wing Roof
Renovation
Sub-Bidding
$1,000,000 CJ est. value
West Milwaukee, WI 53214

Baldwin Roof Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Baldwin, WI 54002

Forest County Roof Replacement
Renovation
Post-Bid
Crandon, WI

2021 Time & Material County Grounds - Roofing
Term Contract
Post-Bid
West Allis, WI 53214

Roof Repairs
Renovation
Results
La Crosse, WI 54601

NWTC Areas A & B Roofing
Results
Marinette, WI 54143

Columbia County Health Care Center - Willow Court Siding
Renovation
Sub-Bidding
$70,000 CJ est. value
Wyocena, WI 53969

Wigen Hall Roof Replacement
Renovation
Post-Bid
$136,270 est. value
Menomonie, WI 54751

Esker Hall Roof Replacement
Results
$950,000 est. value
Whitewater, WI 53190

Roof Replacement
Post-Bid
Fond du Lac, WI 54935

Area #11 Roof Replacement
Results
Bristol, WI

Library Roof Replacement
Alteration
Post-Bid
Watertown, WI 53094

Muir ES Roof Rehabilitation
Results
Madison, WI 53705

DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

Last Updated 09/07/2022 10:32 AM
Project Title

Pit Toilet Roof Repair - Storm Damage

Physical Address View project details and contacts
City, State (County) Trempealeau, WI 54661   (Trempealeau County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Trempealeau National Wildlife Refuge Pit Toilet Roof Repair - Storm Damage Statement of Work SCOPE: This statement of work is for repair of the pit toilet roof at Trempealeau National Wildlife Refuge. The roof was damaged when a tree fell on top of it during a late May storm. The original design of the pit toilet is included in attached blueprints. The roof (per original design) was constructed out of structural insulated panels (SIPs) that are no longer being manufactured by the original company. Given that SIPs are no longer available, a repair will need to be designed. Design drawings and specifications should be provided to the refuge manager for approval, prior to conducting work. Structural lumber should be added to the entire damaged side of the roof spanning from the soffit to the peak. The rigid foam portion should be notched out for the structural panel, this allows the insulation and FRP to be reused. The skylight appears undamaged and can be reused The stack collar will need to be replaced The metal roof will need to be replaced on both sides so the colors match. The metal fascia should be replaced as well to ensure it matches the new roof. The roof panels are an exposed fastener ribbed system. The soffits can be rolled from metal coil stock if a preformed piece isn't available. Pictures are provided for reference, but a site visit is strongly recommended for this project. LOCATION: Trempealeau National Wildlife Refuge, W28488 Refuge Rd, Trempealeau, WI 54661. PERIOD OF PERFORMANCE: The period of performance is set to be completed by 10/31/2022. Period of Performance: 09/15/2022 to 10/31/2022 WORK SCHEDULE: Work will be performed Monday - Friday, except on Federal Holidays. CONTACT: Casey Bryan, Refuge Manager, casey_bryan@fws.gov, office: 608-539-2311 x. 6 Work Cell 608-780-7301

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents