Similar Projects
Replacement of Fire Station 10 - Gate City Boulevard - 89 - City of Greensboro
New Construction, Infrastructure
Conception
$9,450,000 CJ est. value
Greensboro, NC 27407

Recreation Senior Center - City of High Point
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
High Point, NC 27260

The Resurgent Mixed-Use Development
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Greensboro, NC 27401

Smith Farm Apartments
New Construction, Infrastructure
Design
$109,000,000 CJ est. value
Greensboro, NC 27410

Downtown Greenway Phase 4
Infrastructure
Bidding
$17,300,086 CJ est. value
Greensboro, NC 27401

RFQ Construction Manager at Risk - Airfield Equipment Storage Building
New Construction, Infrastructure
Bidding
$15,000,000 CJ est. value
Greensboro, NC 27409

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Starbucks / Whitsett - Rebid
New Construction, Infrastructure - 2,485 SF
Post-Bid
$1,200,000 CJ est. value
Whitsett, NC 27377

Liberty Road Water and Sewer Improvements Phase III
Infrastructure
Results
Greensboro, NC 27497

Waterview Pump Station Improvements - Forcemain Extension
Infrastructure
Results
$2,767,305 CJ est. value
High Point, NC 27265

Battleground Avenue Self Storage / Greensboro
New Construction, Infrastructure - 90,750 SF
Construction
$8,000,000 CJ est. value
Greensboro, NC 27408

Linder Industrial Machinery
New Construction, Infrastructure - 32,000 SF
Construction
$9,000,000 CJ est. value
Greensboro, NC 27406

Carroll South
New Construction, Infrastructure - 30,000 SF
Pending Verification
$140,000,000 CJ est. value
Greensboro, NC 27401

Wolfetrail Road Multi Residential
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Greensboro, NC 27406

Mackay Road - 158 - City of Greensboro
Infrastructure
Conception
$3,536,680 CJ est. value
Greensboro, NC 27407

Last Updated 07/21/2023 11:18 AM
Project Title

Eastside Waste Water Treatment Plant (WWTP) UV Disinfection Upgrade and Primary Clarifier Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Jamestown, NC 27282   (Guilford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $4,400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For information regarding this project please contact: Candy Harmon City of High Point NC 816 East Green Dr, High Point, NC 27260 Phone: 336-883-3222 Email: candy.harmon@highpointnc.gov Bids are invited for work as follows as well as all related miscellaneous work: Modify and repair an abandoned chlorine contact tank as required for new UV disinfection equipment. Furnish, install, test, and startup ultraviolet (UV) disinfection equipment. Construct and install a new drain pump station for the Primary Clarifiers along with a new discharge force main for the station into nearby basin The City reserves the right to reject any and all bids, as may in the judgment of the City, serve its best interest and the City further reserves the right to waive irregularities and informalities in any bid submitted. Modify and repair an abandoned chlorine contact tank as required for new UV disinfection equipment. Furnish, install, test, and startup ultraviolet (UV) disinfection equipment. Construct and install a new drain pump station for the Primary Clarifiers along with a new discharge force main for the station into nearby basin. Install new plant drain piping. Reroute the existing plant drain piping to new wetwell. Plug and demolish the existing piping related to the plant drain system. Work includes but is not limited to excavation, backfill, pipe install, painting, equipment suppling and install for new pumps, electrical conduit, wiring and additional appurtenances as required for the successful operation of the new UV System and Primary Clarifier Drain Pumping Station. Provide temporary piping, valves and instrumentation as required to maintain continuous operation of the treatment plant during construction. Questions concerning this bid are due in writing via email by: Friday, April 28, 2023, by 3:00PM to the attention of Candy Harmon at; Questions concerning this bid are due in writing via email by: to the attention of Candy Harmon at; candy.harmon@highpointnc.gov The Project is City of High Point Bid Number 36-051123. The Project is generally described as East Side UV Disinfection Upgrade & Primary Clarifier Drain Pump Improvement Project. The Engineer on the Project is Hazen & Sayer The Contractor shall provide the Owner complete and operational equipment/systems. To this end, it is the responsibility of the Contractor to coordinate all interfaces with related mechanical, structural, electrical, instrumentation, and control work and to provide necessary ancillary items such as controls, wiring, etc., to make each piece of equipment operational as shown and specified. 04-080323 Question and Response Period: Questions concerning this bid are due in writing via email by: Monday, July 17, 2023, by 12:00 PM to the attention of Libby Rush at

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents