Last Updated | 07/21/2023 11:18 AM |
Project Title | Eastside Waste Water Treatment Plant (WWTP) UV Disinfection Upgrade and Primary Clarifier Pump Station Improvements |
Physical Address | View project details and contacts |
City, State (County) | Jamestown, NC 27282 (Guilford County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant, Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,400,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For information regarding this project please contact: Candy Harmon City of High Point NC 816 East Green Dr, High Point, NC 27260 Phone: 336-883-3222 Email: candy.harmon@highpointnc.gov Bids are invited for work as follows as well as all related miscellaneous work: Modify and repair an abandoned chlorine contact tank as required for new UV disinfection equipment. Furnish, install, test, and startup ultraviolet (UV) disinfection equipment. Construct and install a new drain pump station for the Primary Clarifiers along with a new discharge force main for the station into nearby basin The City reserves the right to reject any and all bids, as may in the judgment of the City, serve its best interest and the City further reserves the right to waive irregularities and informalities in any bid submitted. Modify and repair an abandoned chlorine contact tank as required for new UV disinfection equipment. Furnish, install, test, and startup ultraviolet (UV) disinfection equipment. Construct and install a new drain pump station for the Primary Clarifiers along with a new discharge force main for the station into nearby basin. Install new plant drain piping. Reroute the existing plant drain piping to new wetwell. Plug and demolish the existing piping related to the plant drain system. Work includes but is not limited to excavation, backfill, pipe install, painting, equipment suppling and install for new pumps, electrical conduit, wiring and additional appurtenances as required for the successful operation of the new UV System and Primary Clarifier Drain Pumping Station. Provide temporary piping, valves and instrumentation as required to maintain continuous operation of the treatment plant during construction. Questions concerning this bid are due in writing via email by: Friday, April 28, 2023, by 3:00PM to the attention of Candy Harmon at; Questions concerning this bid are due in writing via email by: to the attention of Candy Harmon at; candy.harmon@highpointnc.gov The Project is City of High Point Bid Number 36-051123. The Project is generally described as East Side UV Disinfection Upgrade & Primary Clarifier Drain Pump Improvement Project. The Engineer on the Project is Hazen & Sayer The Contractor shall provide the Owner complete and operational equipment/systems. To this end, it is the responsibility of the Contractor to coordinate all interfaces with related mechanical, structural, electrical, instrumentation, and control work and to provide necessary ancillary items such as controls, wiring, etc., to make each piece of equipment operational as shown and specified. 04-080323 Question and Response Period: Questions concerning this bid are due in writing via email by: Monday, July 17, 2023, by 12:00 PM to the attention of Libby Rush at |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |