Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

9/11 Memorial Park
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Rancho Cucamonga, CA 91730

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

CA FTBL Dumont Dunes (1), Dumont Dunes Road
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
CA

2021 CIP Water Pipeline Replacement Project
Infrastructure
Results
$4,000,000 est. value
Redlands, CA 92373

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Rathbun Creek Trailhead Restroom and Parking Lot - City of Big Bear Lake
Infrastructure
Conception
$660,000 est. value
Big Bear Lake, CA

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

Last Updated 07/26/2023 09:26 AM
Project Title

Wilson III Basin Project Phase 1 C

Physical Address View project details and contacts
City, State (County) Yucaipa, CA 92399   (San Bernardino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storm/Sewers, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $6,095,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Cost $3,900,000 to $4,200,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Duration: 120 Work Days Liquidated Damages: $1,100.00 Per Work Day Bid Bond Percentage: 10% The City is constructing the Wilson III Basin Project (Project) in phases due to upcoming deadlines to expend grant funding and satisfy environmental requirements and commitments for the overall project. The contract work to be done shall consist of furnishing all labor, materials, necessary tools, and equipment, supervision, appurtenances, and all utility and transportation services required for the construction of the Wilson III Basin Phase 1C as a part of the larger Wilson III Basin Project. The Phase 1C work includes construction of the Wilson Creek impact basin near Oak Glen Road, construction of the Oak Glen Channel Inlet (trapezoidal channel), the double 12 X 10 RCB, and the Oak Glen Creek impact basin. Phase 1C also includes construction of a trapezoidal RipRap Channels, and installation of a storm drain line in accordance with the Plans, Drawings, Specifications, and other provisions of the Contract. All earthwork performed during Phase 1C that is required to construct the Phase 1C bid items (including excavation, over-ex and recompaction, backfill, grading, etc.) is considered incidental to the item requiring the additional earthwork in Phase 1C, and no additional payment shall be made for this work. The completed Phase 1A improvements included earthwork excavation, mass grading, transport of the basin material to fill areas within the site, temporary stockpiling of material and oversize rock and construction of interim spillway features to provide capacity for the conveyance of storm flows for flood protection. The completed Phase 1B improvements included installation of a storm drain line, brow ditch and PVC line connections, installation of perimeter fencing and gates, a commercial driveway, and channel riprap protection.

Details

Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents