Last Updated | 07/07/2023 10:05 AM |
Project Title | Main St / Wildcat Way Overlay & CBD Slurry Seal |
Physical Address | View project details and contacts |
City, State (County) | Ellensburg, WA 98926 (Kittitas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,366,349 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of July 7, 2023, project was awarded to Central Paving, LLC, awarded amount is $1,366,349.28.** The project consists of furnishing all labor, materials, equipment, and other miscellaneous items to plane 26,963 square yards of road surfaces and overlay with 4,150 tons of HMA apply 13,321 square yards of slurry seal, remove existing sidewalks, pavement, and subgrade, construct cement. concrete curb, gutter, and sidewalk. construct cement concrete curb ramps; construct cement concrete driveways; install pavement markings; perform traffic control; and other miscellaneous items necessary to complete this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The engineer's range for the project is $1,250,000 to $1,550,000. uestions regarding the Specifications should be Addressed to: 1.6.1.1. Derek Mayo, P.E. City Engineer. mayod@ci.ellensburg.wa.us |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |