Similar Projects
Roofing - 2022 Bond - Olathe Public Schools USD 233
Build-out
Conception
$10,000,000 CJ est. value
Olathe, KS 66061

Asphalt/Concrete - 2022 Bond - Olathe Public Schools USD 233
Infrastructure
Conception
$8,500,000 CJ est. value
Olathe, KS 66061

Tomahawk Elementary School Rebuild/Renovation - 2021 Bond - Shawnee Mission School District
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Overland Park, KS 66204

Corinth Elementary School 2022 HVAC Replacement - 2021 Bond - Shawnee Mission School District
Renovation
Design
$250,000 CJ est. value
Shawnee, KS 66203

Hilltop Conference Center - Food Bank + Conference Room Remodel
Renovation - 1,088 SF
Post-Bid
$500,000 est. value
Overland Park, KS 66223

2019 Roof Improvements - Shawnee Mission School District
Renovation
Post-Bid
$150,000 CJ est. value
Leawood, KS 66209

Rushton Elementary Construction Project
Demolition, New Construction, Infrastructure - 74,000 SF
Construction
$18,679,271 CJ est. value
Mission, KS 66202

Brookridge Redevelopment
LEED Certification, New Construction, Infrastructure - 2,042,805 SF
Pending Verification
$1,735,000,000 CJ est. value
Overland Park, KS 66212

Pawnee Elementary School Rebuild/Renovation - 2021 Bond - Shawnee Mission School District
New Construction, Infrastructure - 77,000 SF
Pending Verification
$23,000,000 CJ est. value
Overland Park, KS 66212

Elementary Schools Playground Surfacing - 2022 Bond - Olathe Public Schools USD 233
Infrastructure
Conception
$6,800,000 CJ est. value
Olathe, KS 66061

Shawnee Mission School District 2025 Various Rooftop Units - 2021 Bond - Shawnee Mission School District
Renovation
Design
$1,000,000 CJ est. value
Shawnee, KS 66203

RFP - Survey Services
Term Contract
Post-Bid
Shawnee, KS 66203

Shawnee Mission Early Childhood Education Center Learning Space Upgrades - 2021 Bond - Shawnee Mission School District
Renovation
Pending Verification
$1,000,000 CJ est. value
Overland Park, KS 66204

District Access Control Upgrade - Olathe Public Schools USD 233
Build-out
Conception
$3,600,000 CJ est. value
Olathe, KS 66061

East Antioch, Overland Park, Indian Hills and Shawnee Mission Northwest Roof Repair/Replacement - 2021 Bond - Shawnee Mission School District
Renovation
Design
$2,500,000 CJ est. value
Shawnee, KS 66203

Last Updated 06/20/2023 12:11 PM
Project Title

Shawnee Mission Early Childhood Education Center Phase 2

Physical Address View project details and contacts
City, State (County) Overland Park, KS 66204   (Johnson County)
Category(s) Education, Green Building
Sub-Category(s) Elementary School, LEED Certified
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,297,805 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations of existing interior classrooms, restrooms, corridors & common spaces, Nabholz Construction Corporation (herein after referred to as "Nabholz" or "Construction Manager") is accepting specialty contractor and supplier proposais for the below referenced project on behalf of Shawnee Mission School District. Approximate Construction Start: | 5/25/2023 Approximate Construction Finish: | 7/28/2023 RFI/Bid Question Deadline: 12:00 PM on 12/27/2022 Bidders shall submit questions by email to Kale Yoder (kale.yoder@nabholz.com), Zach Browne (zach.browne@nabholz.com) & Emma Lewis (emma.lewis@nabholz.com) by the established deadline. Questions should reference specific details, plan sheets, specifications, or bid manual sections. Addendum Issue Date: 1/3/2023 Each bid shall be accompanied by bid security in the amount of five percent (5%) of the base bid, made payable unconditionally to the school district. This security will be submitted as evidence of good faith as a guarantee that, if awarded the contract, the bidder will execute required bonds and insurance within ten (10) days after receipt of Notice to Proceed. For projects with a value of $20,000 or more; subsequent to award, the contractor shall furnish Performance Bond, Labor and Materials Payment Bond, and Kansas Statutory Bond covering the faithful performance of the contract and the payment of all obligations arising thereunder. All such bonds shall be submitted to the school district prior to the commencement of any contract work. The Board of Education reserves the right to reject any or all bids, to accept any item or items in the bid, and to waive any informality in bids. The Contractor shall furnish all labor, materials, facilities, insurance, management, equipment, services, employee training and testing, and agreements necessary to perform the work required for the SMSD Early Childhood Center Remodel: Ceiling & Light Replacement. General construction for this bid shall require mobilization at project sites. The bidder must perform the work in its entirety. Transferring or sharing prime responsibility for the work will not be allowed and will be considered cause for termination. Bid Result : 01.0 Final Cleaning - Turnkey Cleaner - $ 5,995 02.0 Demolition - Eiberger - $ 221,500 03.0 Concrete - Dixon - $ 159,500 06.1 Millwork & Cabinetry - Wynn O Jones - $ 392,561 08.0 Doors, Frames, & Hardware - Omega (Combo Specialties) - $ 183,371 09.0 Light Gauge Framing, Drywall, Acoustical - Dahmer - $ 215,960 09.2 Tile & Commercial Flooring - Commercial Floor - $ 333,000 09.3 Epoxy Flooring - Commercial Floor - $ 30,500 09.4 Painting & Wallcovering - Switzer - $ 58,500 10.0 Building Specialties - Omega (Combo Doors) - $ 183,371 22.1 Plumbing - Questec - $ 146,200 23.1 HVAC - BCI Mech - $ 88,246 26.1 Electrical and Communication - Core - $ 188,866 33.0 General Works Package - Dixon - $ 90,235

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents