Similar Projects
Zero Slater Road
New Construction - 137,500 SF
Conception
$10,000,000 CJ est. value
Morrisville, NC

Legacy Oaks Master Plan
New Construction - 52,900 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Knightdale, NC

Capitol Boulevard Mixed Use
New Construction - 1,700,000 SF
Design
Raleigh, NC

301 West Cabarrus
Renovation - 22,855 SF
Design
$4,250,521 est. value
Raleigh, NC

Liv Cary Apartments
New Construction - 418,962 SF
Sub-Bidding
$62,000,000 est. value
Cary, NC 27518

New DHHS Campus - Phase 1 Package B Sitework
New Construction - 440,000 SF
Sub-Bidding
$59,792,000 est. value
Raleigh, NC

Tower V
New Construction - 322,232 SF
Post-Bid
$10,000,000 CJ est. value
Raleigh, NC 27609

Glenlake III - Site Only Package
New Construction - 211,862 SF
Post-Bid
$10,000,000 CJ est. value
Raleigh, NC

River Oaks Office Renovation
Renovation
Results
Raleigh, NC 27610

Morrisville Town Center Core - Phase I
New Construction - 277,300 SF
Results
$13,000,000 to $44,400,000 est. value
Morrisville, NC

The Willard AC Hotel
New Construction, Demolition - 114,612 SF
Construction
$17,455,109 est. value
Raleigh, NC

Glenwood II - Block 83
New Construction - 267,333 SF
Construction
$108,000,000 est. value
Raleigh, NC

Apple Campus and Engineering Hub
New Construction - 1,000,000 SF
Pending Verification
$1,000,000,000 est. value
Raleigh, NC

Scotts Ridge Office & Veterinary Hospital
New Construction
Pending Verification
Apex, NC 27502

Holland Road - Mixed Use Assembly
New Construction - 76,500 SF
Conception
Apex, NC 27502

Last Updated 06/14/2022 12:52 PM
Project Title

Coastal Federal Credit Union Headquarters

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27609   (Wake County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Parking Garage
Contracting Method Bids by Invitation.
Project Status Schematic Drawings, Construction Start Expected November 2022
Bids Due View project details and contacts
Estimated Value $102,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and new construction of a mixed-use development in Raleigh, North Carolina. Design plans call for the construction of a 400,000-square-foot, 15-story above grade office development; and 360,000-square-foot parking garage. The project scope includes the new construction of an office tower up to 15 stories and a maximum of 400,000-square-feet with a parking garage of a maximum of 360,000-square-feet. on 3.3 acres. As of June 2022, the project is in the design stages and received rezoning approval in 2020. Plans are under review. A general contractor has not yet been chosen. Information regarding the timeline and method of selection has not been disclosed. Construction is not expected to begin before late 2022.*

Details

Office, 15 Stories Above Grade, 400,000 SF New Construction, Parking Garage, 360,000 SF New Construction, 3.30 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents