Similar Projects
Last Updated | 03/01/2023 11:34 PM |
Project Title | Floating Breakwater Replacement Bar Point Harbor |
Physical Address | View project details and contacts |
City, State (County) | Ketchikan, AK 99901 (Ketchikan Gateway County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine, Site Development |
Contracting Method | Competitive Bids |
Project Status | No longer Accepting Requests, Request for Qualifications, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The construction costs will be subject to the funds available for this project. The estimated price is between $10,000,000 and $25,000,000. NAICS 237990 SIZE STANDARD $39.5 MILLION PROJECT TITLE/LOCATION: KETCHIKAN BAR POINT HARBOR BREAKWATER REPLACEMENT AT KETCHIKAN, ALASKA TOTAL SMALL BUSINESS SET-ASIDE BEST VALUE TRADE-OFF FIRM-FIXED PRICE CONTRACT: CONSTRUCTION WAGE RATES (DAVIS BACON) SHALL APPLY DESCRIPTION: Replacement of tw o floating breakw aters at Bar Point Harbor in Ketchikan, Alaska. Bar Point Harbor is currently protected by floating breakw aters held in place by anchor chains and anchor blocks. A small floating breakw ater protects the middle entrance channel and is approximately 120 ft long and 23 ft w ide. A larger floating breakw ater protects the harbor and is 963 feet long consisting of four concrete modules 23 ft w ide each; connected using posttensioned w ire cables. Both floating breakw aters have surpassed their estimated lifespan and need to be replaced. The project w ill include demolition of the existing breakw aters and replacement w ith new , reinforced concrete float-type breakw aters. The breakw aters w ill be moored by chains and concrete anchor blocks. The Contractor shall comply w ith commercial and industry standards as w ell as all applicable Federal, State, and local law s, regulations and procedures. AWARD SUBJECT TO AVAILABILITY OF FUNDS Updated 4 Jan 23: Amendment 1 posted to PIEE.Follow link below to access the solicitation documents and amendment. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |