Similar Projects
Labor & Materials for the Application of Chip & Oil on County Roads
Infrastructure
Bidding
Kingfisher, OK 73750

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Pavement Rehabilitation (p.c.) and Bridge Rehabilitation
Results
Tulsa, OK

Safety Improvement
Results
Tulsa, OK

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Concrete Roadway Panel Replacement with Additional Miscellaneous Concrete Work 3
Infrastructure
Results
$809,281 est. value
Broken Arrow, OK

Citywide Arterial Crack Sealing
Infrastructure
Post-Bid
Tulsa, OK

East Elementary Driveway Entrance Improvements
Alteration
Results
Tulsa, OK 74137

Roadway Milling Project
Infrastructure
Post-Bid
Sand Springs, OK

Elgin Street Improvements from 1st Street to 5th Street
Infrastructure
Results
Less than $407,417 est. value
Broken Arrow, OK

Chip Seal (Double Treatment)
Infrastructure
Results
Tulsa, OK

Pavement Striping
Infrastructure
Results
Owasso, OK 74055

Aspen Ridge Norfolk Drive
Infrastructure
Results
$2,984,324 est. value
Broken Arrow, OK 74011

2021 CIRP - North Asphalt Pavement Rehabilitation
Infrastructure
Results
Bixby, OK

Last Updated 04/20/2022 09:35 AM
Project Title

Jasper Street Paved Ditches

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74011   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project SW2003, Jasper Street, will consist of constructing a trapezoidal paved ditch along the north side of East Jasper Street. The work will start at South Date Avenue and extend east to a South 1st Street. The total linear feet of paved ditch for this project is eight hundred and sixty-five feet (865.0’). The work will consist of preparing the ditch to receive the paved section, laying the concrete, sodding the disturbed area, and project clean-up. Traffic control may be involved, as this street is an arterial. The project in located in the southeast quadrant of section 02, township 17N, range 14E, east and north of the East Jasper Street and South Elm Place Street intersection.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents