Similar Projects
Last Updated | 04/10/2021 04:06 AM |
Project Title | 2021 Birch St & Division St Reconstruction & Private LSL Replacement |
Physical Address | View project details and contacts |
City, State (County) | WI (Marathon County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | PROJECT A – 2021 Birch Street & Division Street Reconstruction Utility Construction: • Approximately 2,200 lineal feet of ductile iron water main (8-inch) including valves, hydrants, leads and water services. • Approximately 1,750 lineal feet of (8-inch) PVC sanitary sewer including manholes and service laterals. • Approximately 1,300 lineal feet of HDPE storm sewer (12-inch to 18-inch) including inlets and manholes. Roadway and Other Associated Work: • Approximately 2,025 lineal feet of urban roadway reconstruction including new base course, HMA paving, concrete curb and gutter, sidewalk, and grading. • Tree removal, grubbing, excavation, turf restoration. PROJECT B – 2021 Birch Street & Division Street Private Lead Service Line Replacement Private Water Service Construction: • Approximately 1,700 lineal feet of copper water service (1-inch) including building penetrations and connections to existing meters. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |