Similar Projects
Trenton Liquid Natural Gas Manufacturing Facility
New Construction, Infrastructure
Conception
$2,800,000,000 CJ est. value
Trenton, ND 58801

Trenton Liquid Natural Gas Manufacturing Facility
New Construction, Infrastructure
Conception
$2,800,000,000 CJ est. value
Trenton, ND 58801

SAFuelsX Sustainable Aviation Production Plant
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Williston, ND 58801

SAFuelsX Sustainable Aviation Production Plant
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Williston, ND 58801

WAWSA - MCWRD Phase 2 Transmission Line
Infrastructure
Bidding
$1,500,000 CJ est. value
Williston, ND 58801

WAWSA - MCWRD Phase 2 Transmission Line
Infrastructure
Bidding
$1,500,000 CJ est. value
Williston, ND 58801

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Mill and Overlay
Infrastructure
Results
$3,500,001 to $4,000,000 est. value
ND

2022 Seal Coat Patching
Infrastructure
Results
Williston, ND

Washington Avenue Shop Condominiums
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Williston, ND 58801

137th Avenue NW Industrial Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Missouri Ridge, ND 58801

Bethel Lutheran Nursing and Rehabilitation Center
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Williston, ND 58801

Love's Speedco Tire Center / Williston
New Construction, Infrastructure - 10,953 SF
Bidding
$3,000,000 CJ est. value
Williston, ND 58801

Hawkeye Village Phase II Improvements
Infrastructure
Post-Bid
Williston, ND

Last Updated 07/25/2023 02:46 PM
Project Title

2023 Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Ray, ND 58849   (Williams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,137,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 10, 2023, project is on hold. No definite date for the rebid.** The work generally consists of 1. Schedule 1 Sanitary Sewer Improvements a. Base Bid: Trenchless cured in place pipe (CIPP) renovation of approximately 2,977 LF of 8inch sanitary sewer main, approximately 46 internally CIPP sealed service lateral connections, CIPP renovation of approximately 30 existing service laterals from the main to the property line, and installation of 2 sanitary sewer manholes. Open-cut replacement of existing sanitary sewer mains/laterals will be included as necessary. Surface restoration will include asphalt pavement, curb and gutter, and landscaping. 2. Qualifications: To demonstrate the Bidders qualifications to perform the Work, within five (5) calendar days of the OWNERs request, Bidder shall submit written evidence of previous experience in performing municipal trenchless sewer main and sewer service renovation using Cured In Place Pipe methods. One contract may be awarded. The award will be based on the lowest responsive, responsible bids on the Base Bid Schedules and Additive Alternates selected by the OWNER. Construction Schedule One must be substantially complete and ready for OWNERs use and pre-final inspection within 75 calendar days of June 1, 2023, or within 75 calendar days of the date on which on-site work is started, whichever is earlier

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents