Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

Town Square - City of Burlingame
New Construction, Infrastructure
Conception
$5,500,000 CJ est. value
Burlingame, CA 94010

435 East 3rd Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 33,876 SF
Design
$9,000,000 CJ est. value
San Mateo, CA 94401

1855 - 1881 Rollins Road
New Construction - 652,900 SF
Design
$5,000,000 est. value
Burlingame, CA 94010

Bayfront Park Sanitary Sewer Improvement
Infrastructure
Bidding
$3,642,388 CJ est. value
Menlo Park, CA 94025

Replace Culvert, Drainage and Erosion Control
Infrastructure
Bidding
$18,000,000 CJ est. value
Belmont, CA 94002

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Replacement of 8-Inch Pipeline Under Pilarcitos Creek (Strawflower) Project
Alteration
Post-Bid
$372,000 est. value
Half Moon Bay, CA 94019

Hopkins Avenue Traffic Calming Project
Alteration
Results
$4,250,000 to $4,680,000 est. value
Redwood City, CA

Bowditch Middle School New Drama and Science Buildings
New Construction, Infrastructure
Results
$15,903,000 CJ est. value
Foster City, CA 94404

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

MBC BioLabs / San Carlos
New Construction, Infrastructure - 152,582 SF
Construction
$40,000,000 CJ est. value
San Carlos, CA 94070

Gateway of Pacific Phase 4
Demolition, New Construction, Infrastructure - 345,842 SF
Pending Verification
$88,000,000 CJ est. value
South San Francisco, CA 94080

222 Gateway Terrace Condominiums
Demolition, New Construction, Infrastructure - 54,445 SF
Pending Verification
$15,000,000 CJ est. value
San Mateo, CA 94401

Burlingame Terrace Subdivision Phase 2 - City of Burlingame
Infrastructure
Conception
$3,400,000 CJ est. value
Burlingame, CA 94010

Last Updated 10/08/2022 12:02 AM
Project Title

Pillar Point Harbor RV Park Restroom and Greenspace Project

Physical Address View project details and contacts
City, State (County) Half Moon Bay, CA 94019   (San Mateo County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected August 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,873,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bids will be accepted only from pre-qualified bidders. Your attention is directed to the Request for Pre-Qualification of Bidders issued concurrently herewith. It is mandatory that all Contractors who intend to submit a bid, fully complete the pre-qualification questionnaire, provide all materials requested in the Request for Pre-Qualification of Bidders, and be approved by San Mateo County Harbor District to be on the final qualified bidders list. No bid will be accepted from a Contractor that has failed to comply with these requirements. Bidders bidding as the prime contractor must possess a valid State of California Class A General Engineering Contractor's License at the time of contract award. All subcontractors, if any, must be properly licensed by the State of California to perform specialized trades. Required Subcontractor licenses include C-10 Electrical Contractor, C-16 Fire Protection Contractor, and C-27 Landscape Contractor. Requests for modifications or clarifications of any requirement and any requests for or equal substitutions must be submitted in writing to San Mateo County Harbor District, attn: Capital Improvement Projects (Pillar Point Harbor RV Park Restroom and Greenspace Project) by e-mail at jmoren@smharbor.com by July 13, 2022, at 4:30 p.m., Pacific Standard Time. Bids must be accompanied by a deposit either in the form of a certified or cashier's check or Bidder's Bond, as described in the documents, which shall be applied to damages sustained by the District in the event that the successful Bidder fails or refuses to enter into a contract awarded to it by the District. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond, both in the amount set forth in the Special Provisions.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents