Similar Projects
Lake Station Crossroads Lift Station Replacement - Section 219
Design
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Gary Sanitary District 27th and Chase Pump Station Force Main Replacement - Section 219, Gary, Lake County, Indiana (USACE Acquisition)
Design
$1,000,000 to $5,000,000 est. value
Gary, IN

Schoolview Drive Lift Station Improvements
Bidding
Rochester, IN

LTCP Phase II Improvements
New Construction
Bidding
Marion, IN 46952

Collection System Improvements
Post-Bid
New Palestine, IN 46163

Water Utility Improvements, Division "C" - Phase 3
Post-Bid
Crown Point, IN 46307

Hague Road and Allisonville Road Lift Stations Improvements
Results
$2,000,000 est. value
Fishers, IN 46038

Madison Street and 65th Lane Sanitary Sewer Improvement
Results
Merrillville, IN 46410

Trinity Storm Water Park Phase II
Bidding
$8,221,000 to $11,714,000 est. value
Evansville, IN

Jeffersonville CSO Storage Interceptor Phase 3
Post-Bid
Jeffersonville, IN

LTCP Phase 5 - South Region CSO Abatement
Results
Noblesville, IN 46060

Eastside Regional Interceptor and Lift Station
Bidding
Franklin, IN 46131

Hessen Cassel Storm and Sidewalk Improvements
Post-Bid
Fort Wayne, IN 46800

ARV & Pump Station & Force Main Replacement
Results
Clarksville, IN 47129

Tillman/Calhoun Lift Station improvements
Bidding
Fort Wayne, IN

Last Updated 03/09/2021 05:02 PM
Project Title

Wastewater Collection System and Lagoon Improvements Project

Physical Address View project details and contacts
City, State (County) Morgantown, IN   (Morgan County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of, but is not necessarily limited to, construction of approximately 15,940 L.F.+/- OF 8” PVC Sanitary Sewer, 2,750 L.F.+/- of 10” PVC Sanitary Sewer, 40 L.F. of 12” PVC Sanitary Sewer, replacement of 271 sanitary sewer laterals, 99+ new 4’-0” diameter precast concrete manholes, rehabilitation of existing manholes, Replacement of Lift Station #1, Improvements at Lift Station #2, replacement of the flow control structure at wastewater lagoon cell #1, and lagoon bank rip-rap stabilization. In addition to these items of work there are other miscellaneous items of work necessary and as specified to make the Project complete.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents