Similar Projects
Unit No. 8 GE FS7E Exhaust Silencer Panel(S) Modifications and Repairs
Bidding
Lakeland, FL 33801

Water Fountain Replacements Citywide
Bidding
Holly Hill, FL

Ground Transportation Facility GMP 8S.1
Sub-Bidding
Orlando, FL 32827

Grizzle Building, Replace Generator, Chiller Pumps, and Air Handling Units
Post-Bid
$2,000,000 est. value
Largo, FL

Annual Control and Safety Valve Repair Services
Term Contract
Post-Bid
Lakeland, FL 33805

46--Water Purification System
Results
West Palm Beach, FL 33410

J--Copy of Service: Visn 8 Boiler Safety Device Testing, Program Development and Training
Results
Bay Pines, Cape Coral, Gainesville, Lake City, Miami, Orlando, Tampa, West Palm Beach, FL - San Juan, PR

Indian River State College Main Campus Chiller Plant Building-X Upgrades Project
Construction
Fort Pierce, FL 34981

Boiler Preventative Maintenance and Repairs
Term Contract
Bidding
FL

Directions for Living
Post-Bid
Clearwater, FL 33764

H--Service: Mechanical Backflow Prevention Evaluation (Cross Connection Survey)
Results
Bay Pines, FL 33744

Maintenance and Repair of Two Cleaver Brooks Steam Boilers
Bidding
Miramar, FL 33027

Navy Point Elementary School Chiller Replacement
Post-Bid
Pensacola, FL 32507

Water Treatment Plant Nano Filtration Membrane Replacement
Results
Hallandale, FL 33009

Commercial Refrigeration Repair Services
Term Contract
Bidding
$250,000 est. value
Bradenton, FL

Last Updated 02/17/2021 11:18 AM
Project Title

Pool Filtration Replacements at Various Pools

Physical Address View project details and contacts
City, State (County) The Villages, FL   (Lake County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove fencing and shrubs as necessary to access equipment area. Remove and properly dispose of old VakPak units or equivalent units at Summerhill and Calumet Grove Pools. Install new VakPak or equivalent units as specified for each location along with optional Aqua-Sol Controller and Chemical Crocks. All components shall be installed per Manufacturers requirements. Units to be plumbed to existing return, supply, overflow, cabinet drain, fresh water make-up piping, auto static line and heater piping. Disconnect all electrical and plumbing services; close and lock pool gate using signage to be provided from Recreation Dept.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents