Similar Projects
High School Gym Construction
New Construction
Design
Mercedes, TX

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Technology Campus Welding Lab Building F
New Construction, Infrastructure
Bidding
$1,850,000 CJ est. value
McAllen, TX 78501

Building Maintenance Services
New Construction
Post-Bid
Edinburg, TX

Taco Bell / Mission
New Construction, Infrastructure - 2,475 SF
Post-Bid
$750,000 CJ est. value
Mission, TX 78572

Central Administration Renovations
Renovation
Results
Mercedes, TX 78570

Trenching and Boring Services for Installation of Traffic Signal Electrical Conduit
Term Contract
Results
McAllen, TX

Habitat At Grove Apartments
New Construction, Infrastructure - 130,000 SF
Construction
$14,000,000 CJ est. value
McAllen, TX 78501

7 Eleven / McAllen
New Construction, Infrastructure - 4,754 SF
Construction
$1,640,000 CJ est. value
McAllen, TX 78501

Quick Quack Car Wash / Donna
New Construction, Infrastructure - 4,189 SF
Pending Verification
$500,000 CJ est. value
Donna, TX 78537

New Parking Lot and Office Building
New Construction, Infrastructure - 1,818 SF
Pending Verification
$350,000 CJ est. value
McAllen, TX 78503

La Joya ISD Esser Funds - Canopy Structures Phase 3
Infrastructure
Design
$98,000 CJ est. value
La Joya, TX 78560

IDEA Public Schools - 2022A Bond Projects - IDEA Pharr-Phase III
New Construction, Infrastructure - 25,748 SF
Post-Bid
$6,000,000 est. value
Pharr, TX 78577

Regional Center for Public Safety Excellence Site Improvements and Leveling for Portable Buildings
Infrastructure
Results
McAllen, TX

Tony's Playhouse
New Construction, Infrastructure - 1,800 SF
Construction
$100,000 CJ est. value
McAllen, TX 78501

Last Updated 05/16/2023 12:20 PM
Project Title

McAllen High School, McAllen Memorial Highs School, and James "Nikki" Rowe High School New Mariachi and Black Box Buildings

Physical Address View project details and contacts
City, State (County) McAllen, TX 78504   (Hidalgo County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A Construction Manager at Risk has been awarded. The previous soliciitation is included below for reference: Request for Proposals (RFP) Construction Manager at Risk (CMAR) McAllen High School, McAllen Memorial High School, and James Nikki Rowe High School New Mariachi and Black Box Buildings The District prefers and encourages contractors to submit their proposal electronically, through portal For additional information, contact Gracie Garza, Senior Buyer at (956) 657-4487. Question Cutoff Date: 6/3/2022 11:00 AM (ET)

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents