Similar Projects
Stormwater Detention Basin Rehabilitation
Bidding
Less than $100,000 est. value
Tewksbury, MA 01876

32 South Main Street Storm Sewer Replacement and Parking Lot
Bidding
Less than $200,000 est. value
Uxbridge, MA

Police Station Storm Water Improvements
Post-Bid
Milton, MA

Inflow Removal Program - Contract 6A
Post-Bid
Less than $1,500,000 est. value
Revere, MA

Emergency Repairs to Sewers and Drains City wide
Results
Less than $1,300,000 est. value
Boston, MA

CCTV Sewer Pipeline Rehabilitation
Results
Less than $100,000 est. value
Franklin, MA

2020 PFAS Mitigation Barnstable Municipal Airport
Bidding
Hyannis, MA 02601

Catch Basin Cleaning Throughout Town
Term Contract
Post-Bid
$95,000 est. value
Belmont, MA

Manhole Rehabilitation Project
Results
Less than $199,550 est. value
Abington, MA

Public Water Line Extension and Residential Connections on a Section of Bennett Street
Bidding
Less than $2,419,000 est. value
Wrentham, MA 02093

Roadway Structures Adjust/Rebuild
Post-Bid
Less than $50,000 est. value
Tewksbury, MA 01876

Clean/Television Inspection of Sewers Citywide
Results
Less than $550,000 est. value
Boston, MA

PVC Storm Drain Pipe
Post-Bid
Dartmouth, South Dartmouth, MA 02748

Sewer and Drain Condition Monitoring in the City of Boston
Results
Less than $503,046 est. value
Boston, MA

Manhole and Catch Basin Adjusting Rings, Catch Basin, Double Catch Basins and Manhole Frames and Grates, Corrugated Polyethylene Tubing and Fittings
Post-Bid
Holden, MA

Last Updated 01/29/2019 05:31 AM
Project Title

Sandwich Harbor Stormwater Mitigation Phases 1 and 2

Physical Address View project details and contacts
City, State (County) Sandwich, MA   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $480,000
Plans Available from Copy Center - 08/22/18
Owner View project details and contacts
Architect View project details and contacts
Description The work consists of construction of stormwater treatment facilities and related work adjacent to the Town Neck Beach Parking Lot off Wood Avenue, and Boardwalk Road, Sandwich, Mass.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents