Similar Projects
Construction of Water and Paving Facilities for Bridge Creek Terrace Drive 2
Infrastructure
Bidding
Cypress, TX 77433

Paving and Traffic Improvements
Post-Bid
$500,000 est. value
Houston, TX

Clay Road Reconstruction
Post-Bid
$2,600,000 est. value
Houston, TX 77282

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

Imperial Forest Section 5
Post-Bid
Houston, TX

FM 1960 - Intersection Improvements
Results
Less than $13,274,738 est. value
TX

Paver Project - University Park Building 11
Post-Bid
Houston, TX

2020 Paving Improvements Project
Results
$344,000 est. value
Piney Point Village, TX 77063

Gessner Road Crosswalk Pavers Replacement
Infrastructure
Post-Bid
$530,000 est. value
Houston, TX 77282

Shepherd Drive and Farnham Street Civil and Utility Duct Improvements (US 59 to Westheimer Road)
Results
Less than $23,462,071 est. value
Houston, TX 77098

Water, Sanitary, Drainage and Paving Facilities in Marvida Section 20
Infrastructure
Post-Bid
$945,000 est. value
TX

Street Repair at Long Drive Townhomes
Results
Less than $132,554 est. value
Houston, TX 77087

Red Line Tactile Replacement
Infrastructure
Post-Bid
Houston, TX

Asphalt Overlay of Various Roads (Package 2020-3), Precinct 3
Results
Less than $4,649,992 est. value
Houston, TX 77002

Last Updated 07/21/2022 12:04 AM
Project Title

Kuhlman Road Reconstruction

Physical Address View project details and contacts
City, State (County) Hunters Creek Village, TX 77024   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project work limit is Kuhlman Road, from Memorial Drive to end of Kuhlman Road. The work primarily consists of the in-place pulverization of the existing roadway material. After pulverization, a stabilization agent will be mixed into the existing roadway material and the material will be compacted, graded and shaped. A two-inch thick asphalt surface will be placed on the stabilized base material. Ancillary work includes traffic control, replacement of existing pavement markings, and ditch regrading.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents