Similar Projects
New Middle School, Security Upgrades and Improvements
Renovation
Bidding
Monett, MO 65708

New Middle School, Security Upgrades and Improvements
Renovation
Bidding
Monett, MO 65708

Senior High School 'C' Building
New Construction
Post-Bid
Sikeston, MO 63801

Washington MS, Four Rivers Career Center Nurse Simulation Lab
Renovation, Addition
Post-Bid
Washington, MO 63090

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Kirkwood High School (KHS) Security Office Renovations Project 2021
Renovation
Bidding
Kirkwood, MO 63122

Fordland Bond Projects
Renovation, Addition
Post-Bid
Fordland, MO 65652

Waynesville Middle School Phase III Additions and Alterations to Parker Fine Arts Building
Renovation, Addition
Bidding
Waynesville, MO

Elementary & High School Classrooms
Addition - 5,425 SF
Post-Bid
Silex, MO 63377

Additions and Renovations to Bernard Campbell
Renovation, Addition
Bidding
Pleasant Hill, MO

Congress Middle School 2021 Renovations
Renovation
Post-Bid
Kansas City, MO

Reported 05/19/2021 12:00 AM
Project Title

Ladue Middle School

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63124   (Saint Louis County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Brand New Gymnasium / Storm Shelter – New Precast Gymnasium and Storm Shelter on the South side of the school. This will include a new Gym, band room, loading docks and mechanical rooms. New Classroom Addition – A structurally framed brick classroom addition on the North side of the Middle school. The addition will consist of new classrooms, science labs, reading area, and computer lab. New Administrative / Cafeteria Addition – A new glass storefront with a 1st floor administrative building with a 2nd floor addition to the cafeteria. Multi-Phase Renovation to the Existing School – The renovations will consist of upgrades to the classrooms, existing cafeteria, music rooms and more.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents