Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1009 over Castile Run - DFB
Demolition, New Construction, Infrastructure
Conception
$230,000 CJ est. value
Waynesburg, PA 15370

PA 88 over Whiteley Creek
Infrastructure, Renovation
Design
$5,115,400 CJ est. value
Greensboro, PA 15338

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Milling of Bituminous Surface
Infrastructure
Bidding
$200,000 CJ est. value
Cumberland Township, PA 15320

Milling of Bituminous Surface
Infrastructure
Bidding
$200,000 CJ est. value
Carmichaels, PA 15320

Post Frame Storage Building Project
New Construction, Infrastructure - 4,224 SF
Post-Bid
$90,000 CJ est. value
Jefferson Township, PA 18436

2022 CDBG Sewer and Interceptor Rehabilitation Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Waynesburg, PA 15370

SCI Greene - Central Utility Plant Upgrade
Renovation
Results
$4,000,000 CJ est. value
Waynesburg, PA 15370

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Legion Field Recreational Improvements Project
Infrastructure
Post-Bid
$224,630 CJ est. value
Mount Morris, PA 15349

PA 218 over Br Smith Creek
Infrastructure, Renovation
Conception
$1,554,075 CJ est. value
Waynesburg, PA 15370

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$4,171,810 CJ est. value
Brecknock Township, PA 19540

Drain Work at Waynesbung Central Junior Senior High School
Infrastructure
Post-Bid
$300,000 CJ est. value
Waynesburg, PA 15370

Last Updated 06/12/2023 07:03 AM
Project Title

SCI Greene - Soil Remediation and Structural Repairs - Phase 2

Physical Address View project details and contacts
City, State (County) Waynesburg, PA 15370   (Greene County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $18,220,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This PROJECT IS A REVISED REBID STANDARD LOW BID PROJECT and includes GENERAL, PLUMBING AND ELECTRICAL CONSTRUCTION. PROJECT TITLE: SCI Greene - Soil Remediation and Structural Repairs ESTIMATED RANGE: .1 General – $1,000,000 - $2,000,000 .3 Plumbing – Under $100,000 & .4 Electrical – $200,000 - $300,000 LIQUIDATED DAMAGES = (.1) $370.00 per day, (.2) $130.00 per day, & (.4) $80.00 per day. There is no Bid Guaranty required for this Project. CLIENT AGENCY REQUIREMENTS: - Pre-Bid meeting is Mandatory! No later five (5) working days (i.e., Monday thru Friday) in advance of the non-mandatory pre-bid conference, all bidders visiting the site will need contact the Dennis Kapolka at the facility via email at dkapolka@pa.gov and provide him with the Bidder's company information and the full names of the persons attending the pre-bid conference. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1, #2 & #3) SDB = 12% VBE = 3% .3 Plumbing Construction - ALL BASE BIDS (#1, #2 & #3) SDB = NA VBE = NA .4 Electrical Construction ALL BASE BIDS (#1, #2 & #3) SDB = NA VBE = NA Bid Results Bid Package Name: DGS C-0372-0004.1_Revised Rebid 1 Section Name: Base Bid Allegheny Construction Group, Inc. $5475000 Section Name: Base Bid 2 Allegheny Construction Group, Inc. $5875000 Section Name: Base Bid 3 Allegheny Construction Group, Inc. $6325000 Bid Package Name: DGS C-0372-0004.3_Revised Rebid 1 Section Name: Base Bid JONES MASONRY RESTORATION CORP $545000

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents