Similar Projects
Ravine and Streambank Site Restoration
Conception
$43,900 est. value
Beach Park, IL 60085

Emerging Environmental Requirements Acquisition (EERA)
Design
Less than $49,000,000 est. value

Expressway Mowing North
Bidding

Buffalo Grove Parks 2021 Improvements
Renovation
Bidding
Buffalo Grove, IL 60089

Quality Assurance (QA) Seeding
Post-Bid

Tree and Brush Removal
Post-Bid
Volo, IL 60073

Dead Tree Removal along Expressway and Arterial Routes of District One
Results

Drainage Improvements - Grayslake Central High School
Results
Grayslake, IL 60030

2021 Behm Park Improvements
Renovation
Bidding
Mundelein, IL 60060

Expressway Mowing North
Post-Bid

Ben Diamond Park Playground Installation
Results
Waukegan, IL 60087

The Knoxville United Methodist Church Lawn Care
Bidding
Knoxville, IL 61448

Natural Area Maintenance
Post-Bid
Less than $40,000 est. value
Lake Zurich, IL

Oakwood Cemetery Fencing Replacement
Renovation
Results
Waukegan, IL 60085

Laschen Park
Bidding
Vernon Hills, IL 60061

Last Updated 09/17/2020 07:45 AM
Project Title

2020 Community Park at the Recreation Center of Highland Park

Physical Address View project details and contacts
City, State (County) Highland Park, IL   (Lake County)
Category(s) Environmental, Heavy and Highway
Sub-Category(s) Landscaping, Park/Playground, Shoreline/Erosion/Drainage, Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of new pathways, rehabilitation of existing pathways and removal of existing pathways, to create a “Gateway Trail,” “Connector Trail,” “Secondary Trails” and accessible pathways leading to key amenities. Restoration of disturbed areas corresponding to the overall project planting plan. Construction of the following amenities that include built structures (trail stubs, stone benches, seat walls, outcroppings, pervious pavement areas, and specialized gardens): -Gateway Trail South Access -Gateway Trail Boardwalk/Overlook -View Seating Area (North Pond) -Pollination (Exploration) Garden -North Pond Overlook -Council Ring/Nature Maze -Sand Play/Picnic Area -Entry Plaza Restoration of approximately 2,250 lf of North Pond shoreline with regrading of slopes, installation of live plants and native seeds on the shoreline and in wetland buffer areas.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Wetlands, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents