Similar Projects
Elvis Presley Birthplace Event Center Overlook
Infrastructure
Design
$500,000 CJ est. value
Tupelo, MS 38804

Booneville/Baldwyn Airport Runway and Taxiway Overlay
Infrastructure
Bidding
$2,261,723 CJ est. value
Baldwyn, MS 38824

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Sources of Supply - 12 Month Supply Bid - Minor Water/Sewer Construction/Rehabilitation
Term Contract
Post-Bid
Tupelo, MS

Roadway Maintenance Program - 2022 Annual Bid
Term Contract
Results
Tupelo, MS

Construction of 0.084 Miles of Precast Concrete Span Bridge and Approaches to Replace Bridge No. 181 on CR 1149
Demolition, New Construction, Infrastructure
Results
$505,484 CJ est. value
Tupelo, MS 38804

Booneville-baldwyn Airport 12,000 Gallon Jet-a Fuel Tank Rebid
Renovation, Infrastructure
Construction
$289,000 CJ est. value
Baldwyn, MS 38824

Wastewater Facilities Improvements
Infrastructure
Post-Bid
Plantersville, MS

Rtp Recreational Trail
Infrastructure
Results
$58,547 CJ est. value
Tupelo, MS 38804

Water Materials - 6 Month Supply
Term Contract
Post-Bid
Tupelo, MS

Construction of Widening and Overlay at College Avenue
Infrastructure
Results
$253,406 CJ est. value
Verona, MS 38801

12" Ductile Iron CL350 Push-On Joint Pipe, Cement Lined
Infrastructure
Post-Bid
Tupelo, MS

Church Street School Site Improvements
Infrastructure
Post-Bid
$275,000 est. value
Tupelo, MS 38804

Mcneese St. Pipe Lining Culvert Improvement
Infrastructure
Post-Bid
$225,000 CJ est. value
Tupelo, MS 38804

Construction of a Satellite Fire Station
New Construction, Infrastructure
Post-Bid
$1,800,000 CJ est. value
Baldwyn, MS 38824

Last Updated 05/11/2023 09:52 AM
Project Title

Rebid - Phase One Gas Extension

Physical Address View project details and contacts
City, State (County) Shannon, MS 38868   (Lee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,412,264 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: The Project will be let as a single contract and consists of approximately 9,500 feet of2 inch and 1 inch polyethylene gas line.Bids will be received for a single prime Contract. Bids shall be unit price basis as indicated in the Bid Form. Questions regarding website registration, online orders or electronic bidding requirements, please contact Plan House Printing in Tupelo, MS at (662) 407-0193 or email tupelo@planhouseprinting.com . Contract Documents, including Drawings and Specifications, may be examined at the office of Engineering Solutions, Inc., located at 1324 N. Veterans Blvd., Tupelo, Mississippi, and also can be viewed and/or purchased at Engineering Solutions, Inc. electronically. In the event that an electronically submitted bid has a corrupted attaclunent, the bid will be considered null and void by the owner. Each bid submitted must be marked on the outside Bid for: Rebid- Phase One Gas Extension, Town of Shannon, MS and CDBG PROJECT #1137-20-334-PF-01. A satisfactory Bid Bond executed by the Bidder or an accepted Surety, a certified check, or bank draft payable to the TOWN OF SHANNON, on negotiable U.S. Government Bonds (at par value), shall be submitted with each bid in an amount equal to five percent (5%) of the total bid. This project is being funded in part by the Community Development Block Grant #1137-20-334-PF-01 and the rules and regulations therein apply. The successful bidder must comply with Section 3 of the Housing and Urban Development Act of 1968 (12 U.S.C. 1701 u). CDBG regulations governing the grant require that, to the greatest extent feasible opportunities for contracting, subcontracting, training and employment arising in connection with this CDBG project will be extended to Section 3 businesses and Section 3 residents. Minority and Woman Owned Business Enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities, equipment, material and/or supply needs. Town of Shannon is an Equal Opportunity Employer, and hereby notifies all Bidders will be afforded the full opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, national origin, age, disability, sexual preference, marital or veteran status, or any other legally protected status in consideration for an award. The successful bidder must comply with the Davis-Bacon Act which requires that all laborers and mechanics shall be paid at rates not less than those determined by the Department of Labor to be prevailing for the locality in which the project is located.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents