Similar Projects
Solon-Chagrin Falls Multi-purpose Trail - State of Ohio
Infrastructure
Conception
Chagrin Falls, OH 44022

Bike Trail - Euclid Creek Greenway - City of Cleveland
Infrastructure
Conception
$2,000,000 CJ est. value
Cleveland, OH 44113

Subdivision In Broadview Heights
New Construction
Design
Broadview Heights, OH 44147

View on Detroit West Apartments
New Construction, Infrastructure - 3,500 SF
Design
$23,000,000 CJ est. value
Lakewood, OH 44107

Bridge Replacement
Infrastructure
Bidding
$889,000 CJ est. value
Parma Heights, OH 44130

RFP D/B - Riverside Park Playground
Infrastructure
Bidding
Chagrin Falls, OH 44022

East 79th Street Rehabilitation Woodland Avenue to Chester Avenue
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Cleveland, OH 44103

Wolstein Center CEI Utility Vault Repairs
Infrastructure
Post-Bid
$175,770 est. value
Cleveland, OH

Cedar-Lee-Meadowbrook Redevelopment
Results
Cleveland Heights, OH 44118

2020 Meyer Pool Site Improvements
Results
$571,622 est. value
Cleveland, OH 44113

Stafford Park Fitness Trail Project
Infrastructure
Construction
$131,675 CJ est. value
Maple Heights, OH 44137

Solon on the Lake Mixed-Use
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Solon, OH 44139

Town Centre Drive Office Building / JPMS Office II
New Construction, Infrastructure - 42,340 SF
Pending Verification
$9,000,000 CJ est. value
Broadview Heights, OH 44147

Streetscape - E 79 - City of Cleveland
Infrastructure
Conception
$400,000 CJ est. value
Cleveland, OH 44103

9410 Hough Amenity Building
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Cleveland Hts, OH 44106

Last Updated 10/01/2022 02:31 AM
Project Title

Cycle I - Kinsman Tower Rehabilitation

Physical Address View project details and contacts
City, State (County) Beachwood, OH 44122   (Cuyahoga County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Communication Building, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Cycle I- Kinsman Tower Rehabilitation - 1. The existing two million-gallon elevated steel tank shall have the coatings removed on the outside of the bowl, steel repaired, surface properly prepared and re-coated. All of the metal shall have a SSPC-SP-10 Near-White Blast Cleaning. The bare metal shall then be vacuumed, wiped with a cloth, stripe coat all welds and seams by brush, and then coated with a multilayer coating system as specified in Section 09 90 00, Coatings. 2. Repaint the exterior of the tank. 3. Install OSHA compliant temporary painting rigging. 4. Repair/replace grout around the legs and inlet pipe. 5. Reconstruct or repair the overflow outlets at Kinsman Water Tower. 6. Reattachment of AMR equipment to the tower. 7. Replace cathodic protection. The scope of the entire Site improvement includes, but is not limited to: 1. Additions of new or replacement equipment, instrumentation, wiring, other devices, and appurtenances. 2. Environmental, safety and health regulations compliance. 3. Removal of existing coatings. 4. Surface preparation and coating of tank with specified coatings. 5. Repair/replace grout around the legs and inlet pipe. The Kinsman Water Tower and facilities are located at 25100 Chagrin Blvd, Beachwood, Ohio. 0% MBE Participation 0% FBE Participation 5% CSB Participation

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Seating.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Communications Equipment Room Fittings, Communications Backbone Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents