Similar Projects
Boat Storage Facility
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Gloucester, MA

Little Beach Pier and Beach Maintenance Project
Conception
Falmouth, MA 02114

Drydock and Overhaul Services for the M/V Gayhead
Bidding
Falmouth, MA

Two Float Replacements
Bidding
Bourne, MA 02532

Rehabilitate Existing Timber at Eastern and Southern Piers
Post-Bid
Less than $618,000 est. value
Boston, MA

Regatta Point Waterfront Rehabilitation
Post-Bid
Less than $618,000 est. value
Boston, MA

Removal and Replacement of Pilings, Floats, and a Gangway Located on the Onset Pier
Results
Less than $339,373 est. value
Onset, MA

Z--CACO - Replace Marconi Beach Stairs
Results
Wellfleet, MA

Crosby Yacht Yard
New Construction
Construction
Osterville, MA

Neponset Landing II Spray Deck Renovation Demolition
Post-Bid
Less than $800,000 est. value
Boston, MA 02114

Owen Park - Pier Repair for the Harbor Master
Results
Less than $50,000 est. value
Tisbury, MA

Owner's Project Manager for New Bedford State Pier
Renovation
Post-Bid
$1,700,000 est. value
New Bedford, MA

Y--Hellcat Trail Boardwalk Replacement @ PR NWR
Results
Newburyport, MA 01950

Middle Wharf Wale System Replaced
Post-Bid
Less than $60,000 est. value
Mattapoisett, MA 02739

Barlows Landing Dinghy Dock Improvement
Results
$260,000 est. value
Buzzards Bay, MA

Reported 08/27/2020 12:00 AM
Project Title

Steel Sheet Pile Bulkhead, Associated Tie-Back Anchor Systems, and Concrete Cap

Physical Address View project details and contacts
City, State (County) Fairhaven, MA 02719   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,050,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of installation of 115 LF of proposed steel sheet pile bulkhead, associated tie-back anchor systems, and concrete cap with a concrete filled steel pipe pile fender system.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Hydraulic Fabrications, Hydraulic Bulkheads.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents