Similar Projects
Inca Roofing and Weatherization Project
Bidding
Buckeye, AZ 85326

General Contractor for the Weatherization Project at Curiel Primary School
Post-Bid
Eloy, AZ 85131

Navajo Housing Authority (NHA) Procurem
Post-Bid
Window Rock, AZ

Multiple Breakroom Refresh
Results
Phoenix, AZ

General Contractor for the Weatherization of the Building Envelope Project
Results
Superior, AZ 85173

Construction of Permanent Non-Bearing Partition Walls for Casa Grande City Hall
Post-Bid
Casa Grande, AZ

Maintenance/Repair of PKID 07-10 Madera Parc Wall
Results
Less than $7,276 est. value
Gilbert, AZ 85233

General Contractor for 2 Weatherization projects
Results
Seligman, AZ 86337

Weatherization Project at Bonita Elementary School
Results
$500,000 to $600,000 est. value
Willcox, AZ 85643

Weatherization for Osborn Middle School
Results
Phoenix, AZ 85013

Weatherization for Clarendon Elementary School
Results
Phoenix, AZ 85013

Weatherization for Longview Elementary School
Results
Phoenix, AZ 85014

Weatherization for Solano Elementary School
Results
Phoenix, AZ 85015

Lake Mead, AZ, Tile, Baseboard, Paint Quarters
Results
$25,000 to $100,000 est. value
Bullhead City, AZ

Job Order Contractor For Parks And Recreation
Results
Less than $5,000,000 est. value
AZ

Last Updated 11/20/2020 05:01 PM
Project Title

Weatherization Project at Combs Traditional Academy

Physical Address View project details and contacts
City, State (County) San Tan Valley, AZ 85140   (Pinal County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of work includes: a. Clean all vertical masonry cracks by grinding or wire brushing to expose a surface free of contamination. Apply approved caulking into crack, dry tooling where necessary. b. Remove all existing building sealants that include but are not limited to; window assemblies, door assemblies and expansion joints, tool existing sealant and clean area. Install new approved caulking per manufacturer’s specifications. c. Prep all coated stucco and CMU block following all manufacturer recommendations / directions and specifications. Contractor to coat the exterior surfaces with the approved elastomeric coating or equal following all manufacturer two (2) coat system recommendations and specifications. Contractor to verify all paint colors with architect/owner prior to application. d. Prep all metal building elevations, including but not limited to all awnings, metal doors and door assemblies, and any other exposed metal trim and flashing starting at the finish floor elevation to the parapet cap following all manufacturer recommendations and specifications. Contractor to prime/spot prime all metal surfaces, where necessary, with an approved Primer. Contractor to recoat all exposed exterior metal with approved product following all manufacturer recommendations and specifications. e. Remove building signage for coating of exterior walls. Clean and reinstall. Typical for all building mounted signs. f. Include an exterior 4’x8’ mockup of exterior colors for Owner review prior to installation. Mock-up may be on plywood or other temporary substrate.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents