Similar Projects
2868 Rufina Street Mixed Use
New Construction - 126,382 SF
Conception
$10,000,000 CJ est. value
Santa Fe, NM 87507

AutoZone #4052
New Construction - 6,000 SF
Design
$1,500,000 est. value
Santa Fe, NM 87507

Plaza Contenta
New Construction, Infrastructure - 14,000 SF
Design
$60,000,000 CJ est. value
Santa Fe, NM 87507

Hot Mix Asphalt in Place
Infrastructure
Bidding
Santa Fe, NM

Regional Emergency Communications Center
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Santa Fe, NM 87501

Base Course Fill
Post-Bid

Walmart 0-3--TENANTBID--2021 - Bundle #3
Renovation
Post-Bid

Camino Coyote Lane
Results
$701,403 est. value

Foamed Asphalt Stabilized Base D-6
Term Contract
Results
Santa Fe, NM

O'Reilly Auto Parts (SF1)
Addition
Construction
Santa Fe, NM 87505

Walmart Supercenter #4201-238 - SPRB-R
Renovation
Construction
$1,733,641 est. value
Edgewood, NM 87015

San Isidro Plaza
New Construction, Renovation
Pending Verification
Santa Fe, NM 87507

Monte Sereno
New Construction - 190,700 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Santa Fe, NM 87506

Neuava Seyctia
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Santa Fe, NM 87507

Asphalt Concrete Hot Laid In-Place D-1
Term Contract
Post-Bid
Santa Fe, NM

Last Updated 07/25/2022 01:34 PM
Project Title

201 Old Santa Fe Trail Hotel

Physical Address View project details and contacts
City, State (County) Santa Fe, NM 87501   (Santa Fe County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Parking Garage, Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $4,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 19 room hotel with retail space and underground parking. Permits were issued in May 2022 for demolition of existing fencing and installation of a temporary power pole. As of July 25, 2022, no building permits have been issued. An architect is on board, but information regarding the method of general contractor selection has not been disclosed. A firm timeline for construction is unavailable. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Rooms, 19 Unit(s). 841 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents