Similar Projects
Rehabilitate Pavement at Taxilanes E1 and E3, and Will Reconstruct The Taxiway E/G Intersection at The Ted Stevens Anchorage International Airport
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
Anchorage, AK

ANC Runway 7R/25L Joint Repair
Infrastructure
Results
$500,000 to $1,000,000 est. value
Anchorage, AK 99502

Alakanuk Airport Apron and Taxiway Improvement - Alaska Department of Transportation & Public Facilities DOT - Northern Region
Infrastructure
Conception
$261,765 est. value
AK 99554

Extend Runway 16/34 and Construct Two Supporting Taxiways, JBER, Alaska (Jbe054)
Alteration
Post-Bid
$150,000,000 to $250,000,000 est. value
JBER, AK 99506

Design and Construction Associated with Pavement Markings for Runway 11/29, Taxiways, and Apron
Infrastructure
Results
Less than $200,000 est. value
Kake, AK

Red Devil Airport (RDV) and Kalskag Airport (KLG) Surface Preservation Maintenance (SPM)
Infrastructure
Results
$500,000 to $1,000,000 est. value
Red Devil, AK

Brevig Mission Airport Lighting and Resurfacing
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
Brevig Mission, AK

2021 Kenai Municipal Airport Airfield Drainage
Infrastructure
Results
Kenai, AK

Hope Airport (5HO) Surface Preservation Maintenance (SPM)
Infrastructure
Results
$200,000 to $500,000 est. value
Hope, AK 99605

Airport Apron Seal 2022
Infrastructure
Post-Bid
$60,000 est. value
Wasilla, AK

Chefornak Airport Rehabilitation
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
Bethel, AK

Last Updated 07/15/2022 02:26 AM
Project Title

Kotzebue Airport Runway Settlement Repair

Physical Address View project details and contacts
City, State (County) Kotzebue, AK 99752   (Northwest Arctic County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of repairing significant depressions on Runway 9/27 that are causing large ponds to form between Taxiways C and D.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents