Similar Projects
Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Aluminum Pipe Culvert With Headwalls
Results
Charlottesville, VA 22911

Pipe Rehabilitation VDOT Culpeper District
Term Contract
Results

Reconstruction of One Earthen Shoreline Wave Berm on One Flood Control Dam
Post-Bid
Culpeper, VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Concrete Pipe/ NOVA Infrastructure
Term Contract
Results

Delivered Concrete Pipe- Prince William
Results
VA

Concrete Pipe
Term Contract
Results

On-Call Emergency Soil Repair
Term Contract
Results

HDPE Pipe
Term Contract
Results
Gainesville, VA 20155

Cedar Hill Stormwater Rehabilitation Project
Results
$41,349 est. value
Charlottesville, VA

Ditchwitch Reconstruction
Results
Charlottesville, VA

Soil Erosion Control Services
Term Contract
Results
Lake Ridge, VA 22192

Last Updated 05/29/2020 08:42 AM
Project Title

HDPP Pipe Culpeper District

Physical Address View project details and contacts
City, State (County) Bealeton, Crozet, Culpeper, Free Union, Gainesville, Gordonsville, Keene, Louisa, Marshall, Mineral, Palmyra, Pratts, Rhoadesville, Ruckersville, Troy, Warrenton, Washington, VA (Albemarle, Culpeper, Fauquier, Fluvanna, Greene, Louisa, Madison, Orange, Prince William, Rappahannock Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified firms to provide, delivery and furnish ADSN-12 HP or approved equal of Polypropylene (PP) Double/Triple-Walled and Smooth Lined Pipe and/or materials for construction of culverts, side road pipes, storm drains, sanitary sewers, stubs, and all related connections and fittings, all of which shall conform to AASHTO MP21-11, lasted edition. In addition, ADS N-12 or approved equal shall include all connections and joints to new or existing pipes, storm drainage catch basins, sanitary sewer manholes, inlets, headwalls, and other appurtenances as may be required to complete work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents