Similar Projects
Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Encompass Health Inpatient Rehabilitation Hospital / Hillboro
New Construction, Infrastructure
Conception
$36,000,000 CJ est. value
Hillsboro, OR 97124

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

Ash Drive Pavement Repair
Infrastructure
Bidding
$240,000 CJ est. value
Tigard, OR 97223

Ash Drive Pavement Repair
Infrastructure
Bidding
$240,000 CJ est. value
Tigard, OR 97223

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

QSJ RCLR Road Repair
Infrastructure
Post-Bid
$125,000 to $145,000 est. value
Hillsboro, OR 97124

ADA Ramps Fischer and Roshak Multiple Locations
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Hillsboro, OR

OR8 at River Road Section
Infrastructure
Results
$500,000 to $1,000,000 est. value
OR

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Hall Boulevard / Pfaffle Street New Traffic Signal - City Of Tigard
Infrastructure
Conception
$950,000 CJ est. value
Tigard, OR 97223

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Beaverton High School Replacement - MEP (Mechanical, Electrical, Plumbing)
Demolition, New Construction, Infrastructure
Bidding
$210,800,000 CJ est. value
Beaverton, OR 97005

Last Updated 02/23/2023 08:06 AM
Project Title

OR 8 Corridor Safety and Access to Transit II

Physical Address View project details and contacts
City, State (County) Forest Grove, OR 97116   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,338,085 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improve safety and access to transit for pedestrians and cyclists along OR-8. Work includes: bike lane from SW 182nd Ave to SW 153rd Dr., pedestrian crossings, and separated walkway and bike lane across Rock Creek Bridge. As of February 23, 2023, the project is in Final Planning status. Anticipated Construction year is 2024. ODOT - OR 8 Corridor Safety and Access to Transit II *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents