Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Fine Arts Building Elevator Modernization
Renovation
Bidding
Lexington, KY 40508

Maintenance, Repair and Operations (MRO) Trade Services
Renovation, Alteration
Bidding
Lexington, KY

Downtown Street Light Equipment
Alteration
Post-Bid
Lexington, KY

Torres Lighting Equipment
Alteration
Post-Bid
Lexington, KY

UK PAV A Central Sterile Sink
Addition
Results
$55,000 est. value
Lexington, KY

Asphalt Surface With Grade and Drain
Results
KY

Underground Electrical Services
Term Contract
Bidding
Lexington, KY

Hanger Fans
Term Contract
Post-Bid

Improve Electrical Infrastructure - Ag Complex
Results
Less than $6,100,000 est. value
Lexington, KY

Solar PV Installation Fire Station 21
Alteration
Bidding
Lexington, KY 40509

Electric Generators Preventive Maintenance
Term Contract
Post-Bid
Lexington, KY

New High-Voltage Electrical Duct Bank Across South Upper Street
Alteration
Results
$243,726 est. value
Lexington, KY 40502

Leestown Road FMC Culvert Replacement
Infrastructure
Bidding
Lexington, KY 40511

Emergency Lighting and Equipment
Alteration
Post-Bid
Lexington, KY 40510

Last Updated 02/08/2022 12:40 PM
Project Title

Huguelet Tunnel Phase 1A

Physical Address View project details and contacts
City, State (County) Lexington, KY   (Fayette County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Electric, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install a new 2” high pressure return pipe (HPR) from the existing west side of the tunnel under Rose St at Huguelet and extend to the existing steam vault near Small Animal steam vault. In addition, install a new 3” forced main on the sump pump from the west side tunnel to the closest sanitary manhole. Extend new electrical service from the existing Small Animal steam vault to the existing west side tunnel and provide new lighting and power in the west side tunnel.

Details

Division 26 - Electrical.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents