Similar Projects
Membrane Replacement on Anaerobic Digester Covers Water Pollution Control Plant
Post-Bid
Milledgeville, GA

USDA Sewer System Improvements
Post-Bid
Thomaston, GA

NOWRF and MOWRF Tertiary Filtration
Results
Athens, GA

Interstate Centre WWTF and LAS Expansion
Renovation, Addition
Results
Richmond Hill, GA 31324

SCWRF Vent and Flare System
New Construction
Post-Bid
Columbus, GA 31901

Rose Creek Odor Control Phase 3 Project
Results
Less than $1,121,430 est. value
Woodstock, GA 30189

Flat Creek WRF Clarifier Renovation
Renovation
Post-Bid
Gainesville, GA 30504

Professional Operations, Maintenance and Management Services
Results
GA

North Oconee WRF and Middle Oconee WRF Improvements
Renovation
Post-Bid
$23,000,000 to $26,000,000 est. value
Athens, GA 30605

R.L. Sutton WRF Lime Systems Upgrade
Results
GA

US-78 Lanier Sewer Pump Station Decommissioning
Demolition
Post-Bid
GA

Noonday Creek WRF Primary Clarifier Rehabilitation
Results
Kennesaw, GA 30144

NCWRF and SCWRF Structural Assessments and Repairs
Renovation
Post-Bid
Columbus, GA 31904

Travis Field Water Reclamation Facility Force Main
Results
Savannah, GA

Decommission Brick Store Land Treatment System
Infrastructure
Post-Bid
Covington, GA 30014

Reported 02/18/2022 12:00 AM
Project Title

Flowery Branch WWTP Interim Improvements

Physical Address View project details and contacts
City, State (County) Flowery Branch, GA 30542   (Hall County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: This project consists of interim improvements at the Flowery Branch WRF to maximize capacity at the plant pending installation of a new facility. The project will consist of but not be limited to the following improvements: installation of new 16-inch pipe to connect existing inlet channel to filter segment, removal of plate between filter segment and chlorine contact tank, installation of new gravity flow pipe from Basin A to Basin C, installation of new RAS pump and piping, conversion of existing standby clarifier feed pump to transfer RAS to the filter segment, conversion of existing filter segment to additional aeration tank, installation of new piping in chlorine contact tank, installation of two rental aeration blowers with new piping and connections to existing air header, upsizing existing blower suction to 18-inches, upsizing section of aeration main to 12-inch piping, and installation of electrical feeds for the new RAS pump and rental blowers. The contactor shall rent and maintain two PD blowers for a total of 24 months after the interim improvements.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents