Similar Projects
Reported | 12/18/2019 09:23 AM |
Project Title | WTCC - Building NR - Automotive and Collision Repair Facility |
Physical Address | View project details and contacts |
City, State (County) | Raleigh, NC 27616 (Wake County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | |
Project Status | Construction Commenced November 2019 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | REBID Packages 06A-Millwork & Casework, 07B-Roofing, 08A-Doors/Frames/HW, 08BOverhead Coiling Doors, 08D-Translucent Sandwich Panels, 09DAcoustical Wall Treatment, 09E-Fluid Applied Flooring, 09FResilient Flooring & Carpet, 09G-Terrazzo, 09H-Sealed & Polished Concrete Floors, 10A-Specialties and Wall Protection, 10B-Lockers, 10C-Signage, 10D-Prefabricated Canopies, 11A-Vehicle Service Equipment, 12A-Window Treatments, 14A-Elevators, 21A-Fire Protection, 22A-Plumbing, 27A-Low Voltage Systems, 32A–Concrete Paving and Sidewalks, 32B-Landscape/Hardscape, and 32C-Permanent Site Fencing. New Wake Tech Building NR, an auto and collision repair school at the Wake Tech North Campus. The project is located at the intersection of Fox Road and Perry Creek Road. The project is approximately 100,653 SF of new building construction and site construction over a 10+ acre site. The building consists of a first floor teaching lab with open bay repair spaces and heavy shop equipment consistent with this type of shop facility. The upper floors consist of administrative and classroom spaces. The building is a steel structure on spread footings with ground level basement and foundation walls. Exterior skin is a mix of masonry, metal panels and curtainwall to fit in with the rest of the Wake Tech campus. Interior finishes vary from sealed concrete and CMU walls in the shop spaces to standard classroom and office finishes on the upper floors. Bid Packages: 01A General Trades, 01B Final Clean, 03A Cast-In-Place Concrete, 04A Masonry, 05A Structural and Miscellaneous Steel, 06A Millwork and Casework, 07A Waterproofing, 07B Roofing, 07C Metal Panels, 07D Perforated Metal Panels, 08A Doors, Frames, and Hardware, 08B Overhead Coiling Doors, 08C Glass and Glazing, 08D Translucent Sandwich Panels, 09A Metal Studs and Drywall, 09B Hard Tile, 09C Acoustical Ceilings, 09D Acoustical Wall Treatments, 09E Fluid-Applied Flooring, 09F Resilient Flooring and Carpet, 09G Terrazzo, 09H Sealed and Polished Concrete Floors, 09J Painting, 10A Specialties and Wall Protection, 10B Lockers, 10C Signage, 10D Prefabricated Canopies, 11A Vehicle Service Equipment, 11B Appliances, 12A Window Treatments, 14A Elevators, 21A Fire Protection, 22A Plumbing, 23A HVAC and Hydronic Piping, 26A Electrical, 27A Low Voltage Systems, 31A Sitework, 32A Concrete Paving and Sidewalks, 32B Landscape and Hardscape, 32C Permanent Site Fencing. |
||||||||||||||||||||||||||||||||||||||
Details | 1 College/University, Approximately 100,653 SF New Construction, 10 Acres.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |