Similar Projects
RFQ Construction Manager - Construction Management Services New PreK - 5 Elementary School
New Construction, Infrastructure - 80,000 SF
Conception
$46,600,000 CJ est. value
Madison, CT 06443

Storm Drainage Improvements - Town of Madison
Infrastructure
Conception
$500,000 est. value
Madison, CT

Contractor - Steam Supply Double Block and Bleed Station With Bypass Line Installation
Infrastructure
Design
$200,000 est. value
West Haven, CT 06516

RFP - FY 23-B026 Solar Photovoltaic Systems
Infrastructure
Bidding
$2,000,000 CJ est. value
Naugatuck, CT 06770

Orchard Street Area Sewer Separation Project
Infrastructure
Bidding
$200,000 CJ est. value
New Haven, CT 06510

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Wrong Way Signs With Flashers in Various Towns Statewide
Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
New Haven, CT 06510

Lower Mill River Interceptor Rehabilitation - Phase 1
Post-Bid
New Haven, CT

Soil Borings and Rock Cores
Term Contract
Post-Bid
Wallingford, CT

Water System Audit and Leak Detection Survey
Results
Waterbury, CT

Madison Town Hall Concrete Step Project
Results
Madison, CT

Grove and Adams Street Drainage Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Waterbury, CT 06710

Traffic Highway Signing Replacement and Exit Renumbering on Route 8 - Districts 3 and 4
Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
New Haven, CT 06510

On-Call Water Utility Repair Service
Term Contract, Infrastructure
Post-Bid
Waterbury, CT

Valve Box Risers, Covers and Debris Plugs
Results
Waterbury, CT

Last Updated 07/29/2022 12:43 AM
Project Title

Yale Campus/Trumbull Street Area Sewer Separation Project: Phase 2

Physical Address View project details and contacts
City, State (County) New Haven, CT 06510   (New Haven County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Concrete, Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Yale Campus/Trumbull Street Area Sewer Separation Project: Phase 2 Pearl Street / Lincoln Street / Bradley Street / Whitney Avenue / Sachem Street / Green Infrastructure at Various Locations New Haven, Connecticut This project consists of the installation of approximately 6,050 linear feet of 15" to 42" RCP storm sewers, 320 linear feet of 12" PVC sanitary sewers and PVC laterals utilizing open cut excavation, storm and sanitary sewer manholes, and other appurtenances, and surface restoration. The project also includes the installation of green infrastructure components including 22 bioswales, 45 infiltrating catch basins, and 7 bump-out bioswales at various locations The Contractor shall fully complete the work stipulated in the Contract Documents within FOUR HUNDRED EIGHTY-FIVE (485) consecutive calendar days following Notice to Proceed. The date for completion will be calculated from a date ten (10) days following the date of the Engineer's written notice to proceed.The Information for Bidders, Proposal, Form of Contract, Plans and Specifications will be available on Friday, June 10, 2022, at the Authority's offices located above address Anyone submitting a bid for this project must also have, in their possession, and be listed with GNHWPCA as having purchased a copy of THE GREATER NEW HAVEN WATER POLLUTION CONTROL AUTHORITY STANDARD SPECIFICATIONS, dated September 2017, including all revisions thereto. The document can be obtained upon payment of One Hundred Dollars ($100.00). A certified check or bid bond, in the amount of ten percent (10%) of the total bid amount must accompany the bid. Said checks or bid bonds will be returned to the unsuccessful bidders upon Award of the Contract to the selected firm and execution of the Agreement. If any bid is not accompanied by a bid bond or check at the specified time for the bid opening, the incomplete bid will not be read, and this action will constitute automatic rejection of the bid. The successful bidder will be required to furnish a performance bond and a labor and materials payment bond in the form as attached to the Bid Documents for the amount of the total bid. A certified check cannot be substituted for either bond. The Authority reserves the right to alter quantities and to accept or reject any or all bids or any potion of any bids, for any or no reason, including unavailability of appropriated funds as it may deem to be in its best interests. Any Contract awarded under this Invitation to Bid is expected to be funded in part by a loan and grant from the State of Connecticut DEEP. Neither the State of Connecticut nor any of its Departments, agencies or employees shall be a party to this Invitation to Bid or any resulting Contract.All potential bidders who have purchased the bid package will receive an email in advance with additional Pre-Bid Conference instructions. Bidders are required to comply with 40 CFR 33.24 of the USEPA's policy on the increased utilization of Minority Business Enterprises (MBE) and Women's Business Enterprises (WBE). The minimum participation rate required by the CTDEEP is 3% of the total Contract price for MBE's and 5% for WBE's. Bidders are required to comply with the affirmative action / equal opportunity employment requirements of all contractors / subcontractors as noted in Governor's Executive Orders No. 3 and 17, included in the Project Manual. Bidders are required to comply with the Davis Bacon Act regarding federal wage rate requirements and the State of Connecticut Prevailing Wage rates. Where there is a conflict between the two requirements, the more stringent shall apply. Bidders/contractors shall be responsible for obtaining the Federal Wage Rates. It is the responsibility of the bidder/contractor to request before opening , if necessary, any additional information on Federal and State Wage Rates for those tradespeople who are not covered by the applicable Federal and State Wage Determination but who may be employed for the proposed work under this contract. Bidders are required to comply with the American Iron and Steel (AIS) requirements outlined in the final Environmental Protection Agency (EPA) guidance memorandum dated March 20, 2014, and CT DEEP Revised Clean Water Fund Memorandum (2014-001a) dated May 28, 2015. All bidders are to note that the award of this Contract is subject to the following conditions and contingencies: 1. The approval of such governmental agencies as may be required by law. 2. The appropriation of adequate funds by the proper agencies.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents