Similar Projects
22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

Tower Terrace Road from Miller Road to I-380
Conception
$1,500,000 est. value
Cedar Rapids, IA

Street Repair Retainer
Term Contract, Infrastructure
Post-Bid
West Des Moines, IA

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

West Elm and North Vine Street Improvements
Results
$553,988 est. value
West Union, IA

Clover Lane Overlay
Results
Asbury, IA

9Th Avenue South East Improvements from 3rd Road Street to Railroad
Conception
$200,000 est. value
Cedar Rapids, IA 52407

PCC Pavement Patching
Infrastructure
Post-Bid
IA

Edgewood Road NW from Ellis Road to Cedar River Bridge Pavement Rehabilitation
Results
$1,380,000 est. value
Cedar Rapids, IA 52407

Ingleside Drive South West Pavement Improvements
Conception
$250,000 est. value
Cedar Rapids, IA 52404

2021 Street Maintenance
Infrastructure
Post-Bid
Le Grand, IA

FY 2022 Pavement Patching
Results
$1,400,000 est. value
Cedar Rapids, IA

6th Street South West from Capital Drive to 800 South of Commerce Park Drive
Conception
$2,900,000 est. value
Cedar Rapids, IA 52404

2021 Seal Coat
Infrastructure
Post-Bid
$143,728 est. value
Cedar Falls, IA

6th Street SE from 4th Avenue to 6th Avenue
Results
$950,000 est. value
Cedar Rapids, IA 52401

Last Updated 03/03/2022 10:39 AM
Project Title

5Th Avenue Reconstruction - State Street To East Street

Physical Address View project details and contacts
City, State (County) Grinnell, IA   (Poweshiek County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of 5th Avenue – State Street to East Street Project including all labor, materials and equipment necessary for saw-cutting and pavement removal full width and new PCC street construction, subgrade preparation, modified subbase, longitudinal subdrains, storm sewer and intakes, manhole adjustments, driveway and sidewalk construction, traffic control, and miscellaneous associated work, including cleanup.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents