Similar Projects
Prince Street/Adding 24 Assisted Living Facility II Beds
Addition, Demolition, Infrastructure
Design
Conway, AR 72034

Greenbrier Wastewater Treatment Plant Improvement Project
Infrastructure
Bidding
$10,000,000 CJ est. value
Greenbrier, AR 72058

Dry Bores for Conway Corporation
Infrastructure
Post-Bid
$200,000 est. value
Conway, AR

Connecting Hallways/Safe Areas at Elementary School
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Enola, AR 72047

Vilonia Church St. Sidewalks
Infrastructure
Results
$1,675,490 CJ est. value
Vilonia, AR 72173

Runway 4-22 Rehabilitation (Joints and Markings)
Infrastructure
Results
$345,657 CJ est. value
Conway, AR 72034

Hogan Lane Absolute Storage
New Construction, Infrastructure - 50,000 SF
Pending Verification
$4,000,000 CJ est. value
Conway, AR 72034

Donaghey Avenue Multi Family Development
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Conway, AR 72034

Donnell Ridge Pump Station Coating Repair
Infrastructure
Post-Bid
Conway, AR 72034

Garrett Road Improvements
Infrastructure
Results
$1,625,413 CJ est. value
Greenbrier, AR 72058

The Bird's Nest Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Conway, AR 72034

Conway Fire Station 03
New Construction, Infrastructure - 4,100 SF
Post-Bid
$500,000 CJ est. value
Conway, AR 72032

1600 Place PUD
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Conway, AR 72032

Railroad Basin Interceptor Replacement Phase 3
Infrastructure
Post-Bid
Conway, AR 72034

Chestnut Street Improvements Oak to College
Infrastructure
Post-Bid
$80,000 CJ est. value
Conway, AR 72032

Last Updated 06/12/2023 01:03 AM
Project Title

Vilonia Waterworks Association Mount Vernon Pump Station

Physical Address View project details and contacts
City, State (County) Vilonia, AR 72173   (Faulkner County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $624,155 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Vilonia Waterworks Association (Owner) is requesting Bids for the construction of the following Project: Mount Vernon Pump Station Project # 01-22-10 Bids for the construction of the Project will be received at the Vilonia Waterworks Association office located at 19 Industrial Drive, Vilonia, AR 72173 until Thursday, June 8, at 10 a.m. local time. At that time the Bids received will be publicly opened and read aloud. The Project includes the following Work: 1. the installation of approximately 2,015 linear feet of 6" PVC water main and appurtenances 2. the installation of approximately 60 linear feet of 4" D.I. water main and appurtenances 3. the construction of a CMU block pump station building including pumps, piping, valves, and ancillaries 4. the installation of a 45 KW generator with Automatic Transfer Switch 5. mobilization and demobilization 6. clearing, grubbing, earthwork, seeding, and erosion control 7. site grading 8. electrical and controls work 9. miscellaneous appurtenances 10. safety systems 11. items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the lump sum bid item, and the cost thereof shall be considered to be included.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents